Home Companies Wuxi Jiachen Power Electronics Equipment Co., Ltd.

Vacuum Pressure Pouring Equipment Vacuum Resin Casting Machine VPI System

Wuxi Jiachen Power Electronics Equipment Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: No. 68, Zhounan Road, Wanshi Town, Yixing City, Jiangsu Province, China

Contact name:Tang

Inquir Now

Wuxi Jiachen Power Electronics Equipment Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Vacuum Pressure Pouring Equipment Vacuum Resin Casting Machine VPI System

Country/Region china
City & Province jiangsu
InquireNow

Product Details

Vacuum pressure pouring equipment with Casting Process for Electric Insulation Transformers 

TECHNICAL SCHEME  OF  VACUUM CASTING EQUIPMENT

 

According to the user's production needs and the company's years of accumulated experience in manufacturing pouring equipment and design specifications, the following technical scheme is determined for further discussion and negotiation between both parties.

The proposed equipment is suitable for vacuum casting of transformer with two component premixed epoxy resin.

1. GENERAL PROVISIONS

  1. This proposal proposes the technical requirements of the design, structure, final assembly, test and operation of the equipment.
  2. This proposal sets out the minimum technical requirements, and the supplier shall provide high-quality products not lower than this specification.
  3. After the Contract takes effect, the Supplier shall provide the Demander with a production schedule that meets the requirements of the contract delivery date.
  4. The equipment layout drawing, basic condition drawing, electrical drawing and main component structure drawing provided by the supplier shall not be put into operation until confirmed by the demander. The supplier shall unconditionally modify the problems that do not meet the requirements of this technical specification in the drawings.
  5. The equipment specification shall include the working principle, structure, installation instructions, operation methods and precautions, common faults and solutions, suppliers, models and specifications and other relevant technical data of the whole equipment and all important systems.
  6. The Supplier shall be responsible for the performance and operational reliability of the equipment, as well as the design, manufacturing, transportation, installation, commissioning and trial production of the equipment. Implementation of the turnkey project.
  7. The Supplier guarantees to provide applicable, mature and proven technology for pouring equipment.

The spare parts and spare parts which can operate normally within one year will be given free of charge.

2. THE DESIGN OF THIS SET OF EQUIPMENT ADOPTS THE FOLLOWING RELEVANT STANDARDS, MANUALS AND STANDARDS.

  1. This technical specification for Vacuum Pouring Equipment
  2. GB9115.1-2000 "Vacuum Flange"
  3. JB/T6533-97 Rotary Vane Vacuum Pump
  4. Roots Vacuum Pump JB/T7674-95
  5. GB/T6709-96 "Vacuum Pipe and Accessories"
  6. JB1090-1092 "Rubber Seal Type and Size for Vacuum"
  7. GB191 "Graphic Symbol of Packaging, Storage and Transportation"
  8. Vacuum Design Manual, Lanzhou Institute of Physics
  9. Vacuum System Design Manual, Northeastern University
  10. GB/T5226.1-1996 "Industrial Machinery and Electrical Equipment Part I: General Technical conditions";

3. EQUIPMENT CHARACTERISTICS

  1. The vacuum pouring equipment in this scheme is applicable to the vacuum pouring treatment of pouring transformers and reactors.
  2. This scheme reflects the requirements of energy saving and environmental protection. The life of the specially manufactured electric heating plate is more than 3 times that of the imported German heating plate, and the heating power is 75% of the imported German heating plate. Is the real sense of energy saving, environmental protection products.
  3. Unique filtration system, can effectively prevent resin steam into the vacuum pump.

4.TECHNICAL PROPOSAL

  1. EQUIPMENT COMPOSITION
NO.NAMEQUANTITYREMARK
1.1

200L VACUUM FINAL MIXING GAS TANK

SYSTEM

TWO SETS 
1.2VACUUM POURING TANK SYSTEMONE SET 
1.3HEATING SYSTEMTWO SETS 
1.4VACUUM SYSTEMTWO SETS 
1.5COOLING WATER PIPING SYSTEMONE SET 
1.6PNEUMATIC AND PIPING SYSTEMSONE SET 
1.7CONTROL SYSTEMONE SETTOUCH SCREEN
1.8STEEL FRAME PLATFORMONE SETOFFERED BY PART A
  1. TECHNICAL INDICATORS AND PARAMETERS OF EQUIPMENT:
    1. Vacuum pouring pot size Φ2000×L2400
    2. The pumping speed of the main pumping pump of the vacuum system is 300L/S
    3. Working temperature of pouring tank is 70 ~ 85℃
    4. Ultimate vacuum degree of pouring tank (cold state, no load) ≤50Pa
    5. Pouring tank leakage rate ≤50Pa.L/S
    6. The working vacuum of pouring tank is 50 ~ 100Pa
    7. The equipment adopts manual metering and dynamic mixing of materials.
    8. The equipment adopts vacuum casting process.
    9. The mixing tank adopts electric heating, heat conduction oil as heat transfer medium and automatic temperature control. The pouring tank is directly heated by electric heating element. All heating parts are insulated with thermal insulation materials, and the pouring tank is armored with stainless steel plate (SUS430); The mixing tank is armored with thin steel plate and coated on the surface. The surface temperature of the insulation layer is not higher than 20℃ room temperature.
  2. EQUIPMENT POWER, WATER, AIR SOURCE AND BASIC CONDITION

REQUIREMENTS, (USER EQUIPPED WITH: POWER SUPPLY, AIR COMPRESSOR):

  1. Rated power: 80kw, 380V, 50Hz, three-phase five-wire special distribution cabinet, power connected to the electric control cabinet.
  2. Water source: pressure ≥0.2Mpa, maximum consumption 3m3/h, water temperature ≤25℃.
  3. Compressed air: 0.4 ~ 0.6Mpa, maximum consumption of 0.3m3/min
  4. Make foundation, steel frame and outer track of embedded tank according to our design drawings.
  1. TECHNICAL CONDITIONS OF EACH SYSTEM:
    1. A SET OF 400L VACUUM MIXING DEGASSING TANK

Technical specification and application of tank

The effective volume is 400L

Heat conduction oil 10KW

Ultimate vacuum: 50Pa (no load, cold state)

No load leakage rate: 50Pa.L/S

Operating temperature: 60 ~ 80℃

Tank surface temperature Ambient temperature +20℃

Equipped with frequency control device, can adjust the stirring lifting speed according to the viscosity of the material;

Rock wool insulation, stainless steel plate (SUS430, 1.5mm thick) armored, surface coating

This tank is used for mixing epoxy resin and curing agent mixture and vacuum degassing.

The mixing tank is installed on the pouring master side of the vacuum pouring tank to increase production.

TANK BODY ACCESSORIES:

NO.NAMEQTY
1STAINLESS STEEL LINER BODY1 SET
2STAINLESS STEEL TAPERED STAMPED HEAD BASE1 SET
3REDUCER SEAT1 SET
4BEARING, DYNAMIC SEAL, ETC1 SET
5STAINLESS STEEL ANCHOR AGITATOR1 PC
6BUILT-IN FILM DEGASSING DEVICE1 SET
7MANUAL VACUUM SUCTION VALVE DN252 SETS
8ILLUMINATION OBSERVATION DEVICE1 SET
9TEMPERATURE CONTROL SENSOR1 SET
10CAN LID SEAL RING1 PIECE
11PNEUMATIC DISCHARGE VALVE (STAINLESS STEEL DN50)1 SET
12STIRRING REDUCER1 PC
13VARIABLE FREQUENCY SPEED REGULATING DEVICE1 PC
14HEATING MEDIUM LEVEL DISPLAY DEVICE1 SET
15ELECTRIC HEATING ELEMENT2 SETS
16BIMETAL THERMOMETER1 SET
17SPARE FEED PORT (DN100)1 SET
18ACCELERATOR CHARGING PORT AND VALVE1 SET

 

400L MIXING TANK:

4.2 A SET OF VACUUM POURING TANK (ATMOSPHERIC PRESSURE) SYSTEM Vacuum tank technical specifications and uses:

Horizontal tank inner wall size: Φ2000mm×2400mm

Ultimate vacuum: 50Pa (no load, cold state)

No load leakage rate: 50Pa.L/S

Operating temperature: 70 ~ 85℃

Tank surface temperature: ambient temperature +20℃

The casting supervisor adopts pneumatic ball valve for feeding, and can adjust the vacuum casting valve actually needed according to the number of products. The spare flange interface of the casting pipe is reserved for future upgrading.

The pouring tank is horizontal, the door of the tank is swung open on the side, and the tank body is of vacuum pouring tank structure. After the door is closed in place, the tank is clamped.

The vacuum casting process can optimize the casting process, increase the permeability of the material, and finally achieve the effect of reducing the release index of the product.

Lock the can card manually after the can door is closed in place.

The tank body is installed on the ground, and light rail and working trolley (reinforced) are provided in the tank.

The outer surface of the tank is heated by electric heating plate.

The height of the track inside the tank is flush with the track of the transfer trolley outside the tank (self-made by the user of the transfer trolley outside the tank), so as to facilitate the access of the trolley;

Rock wool insulation, stainless steel plate (SUS430) armored processing.

The tank body is provided with other interfaces to meet the technological requirements.

TANK ATTACHMENT

NO.NAMEQTY
1ILLUMINATION OBSERVATION DEVICE6 SETS
2FLANGE CONNECTION VACUUM POURING PORT ROW (DN16)12
3TEMPERATURE SENSOR2PCS
4SPECIAL-SHAPED SEAL RING FOR TANK DOOR1 SET
5MANUAL ROTATING CAN DOOR OPENING AND CLOSING MECHANISM1 SET
6TANK BEARING TROLLEY (6 TONS)1 SET
7BIMETAL THERMOMETER1 SET
8VACUUM POURING MAIN PIPE (DN50 WITH 12 SETS OF DN16 PIPES)1 SET

VACUUM CASTING EQUIPMENT

4.3 TWO SETS OF HEATING SYSTEM

4.3.1 Each unit of the equipment is controlled by an independent temperature control system, which is convenient for each unit to adjust the temperature. The mixing tank adopts heat transfer mode of heat conduction oil. The pouring tank is directly heated by Wuxi electric heating plate, automatic temperature control, overtemperature alarm, 63KW power, the highest heating temperature of 130℃. The heating temperature of all the mixing tank heating system can be adjusted between normal temperature and 80℃.

SYSTEM CONFIGURATION:

HEATING SYSTEM FOR 400L FINAL MIXING TANK:

 NO.NAMEQUANTITY 
1TUBULAR ELECTRIC HEATING ELEMENT (5KW)2 SETS
2DIGITAL DISPLAY TEMPERATURE CONTROLLER1 SET
3TEMPERATURE SENSOR1 SET
4WIRE AND CABLE1 SET

HEATING SYSTEM FOR VACUUM POURING TANK:

NONAMEQUANTITY
1ELECTRIC HEATING PLATE (0.5KW)108 SETS
2HIGH TEMPERATURE CONDUCTOR600 METERS
3TEMPERATURE CONTROL SWITCH6
4DIGITAL TEMPERATURE CONTROLLER1 SET
5PRESSURE PLATE108 SETS
6FIXED STUDS FOR RESISTANCE WELDING216 SETS

4.4 TWO SETS OF VACUUM SYSTEM (A TOTAL OF 3 VACUUM PUMPS):

4.4.1. The maximum pumping speed of a rotary sheet Roots unit to the pouring tank vacuum unit is 300L/S. The working vacuum of the system can be controlled between 50-200Pa; Reduce the possibility of material being pumped into the vacuum system due to high vacuum degree; The system is equipped with 2 sets of special filters to prevent impurities in the pumped gas to the maximum extent and capture condensing condensable gas to protect the vacuum pump.

CONFIGURATION ATTACHMENT:

NO.NAMEQUANTITY
1VSV-300 ROTARY VANE VACUUM PUMP1 SET
2ZJP-300 ROOTS VACUUM PUMP1 SET
3PNEUMATIC VACUUM MAIN VALVE (DN150)1 SET
4ELECTROMAGNETIC CHARGING VALVE1 SET
5MANUAL CHARGING VALVE1 SET
6BELLOWS1 SET
7CONDENSING FILTER1 SET
8VACUUM FILTER1 SET
9DISC VACUUM GAUGE (Z-100)1 SET
10SEAMLESS TUBE VACUUM PIPE (DN150)1 SET

SYSTEM CONFIGURATION ATTACHMENT:

NO.NAMEQUANTITY
1VSV-100 ROTARY VANE VACUUM PUMP1 SET

 

 2PNEUMATIC VACUUM MAIN VALVE (DN50)2 SETS 
3ELECTROMAGNETIC CHARGING VALVE2 SETS
4MANUAL CHARGING VALVE2 SETS
5BELLOWS1 SET
6CONDENSING FILTER1 SET
7VACUUM FILTER2 SETS
8DISC VACUUM GAUGE2 SETS
9SEAMLESS TUBE VACUUM PIPE2 SETS

VACUUM UNIT:

 

CASTING TANK VACUUM UNIT MIXING TANK VACUUM UNIT

4.5. A SET OF AUTOMATIC CLEANING SYSTEM

4.5.1 The system includes: diaphragm pump, solvent tank, flow tank, pipeline, valve, vacuum meter, etc.

4.5.2 The system transmits the solvent to the mixing tank through the special solvent pumping pump;

4.5.3 Complete the automatic cleaning process by pouring pipeline and valve back to the solvent tank through the flow tank, valve and pipeline;

4.5.4 The solvent can is provided with discharge valve to discharge sediment regularly.

4.6. A SET OF COOLING WATER PIPING SYSTEM

The system includes cooling water pipes, valves, pressure gauges and other water points within the scope of the equipment. The user shall connect the water supply and return water points within 5 meters of the equipment site.

NO.NAMEQUANTITY
1GALVANIZED WATER PIPE1 SET
2COPPER BALL VALVESOME PIECES
3ELECTRIC CONTACT PRESSURE GAUGE1 SET
4SWITCH STOP VALVE2 SETS

4.7. A SET OF PNEUMATIC PIPING SYSTEM

4.7.1. Used to provide power for pneumatic valves and cylinders. The user provides the air source within 5 meters of the equipment site. The supplier shall provide:

NO.NAMEQUANTITY
1TRIPLET1 SET
2TWO-POSITION FIVE-WAY VALVE8 SETS
3PIPING ACCESSORIES1 SET

 

 


4.8 A SET OF ELECTRONIC CONTROL SYSTEM (TOUCH SCREEN)

 

 

Function:

The control system is applicable to the ambient temperature of 0 ~ 40℃, wiring, wiring, bridge layout in accordance with the international implementation.

  • Casting tank temperature, vacuum degree detection and digital display.
  • Touch screen control process, display the working state of each equipment unit.
  • Realize stirring motor control, pneumatic valve, solenoid valve control. ● Realize the interlock and interlock between the pump and valve of the vacuum unit.
  • The realization of air pressure, water pressure insufficient alarm device.

Mixing tank feeding by manual preparation, manual input into the mixing tank. ● It can be controlled by manual knob and touch screen.

4.9 OTHER TECHNICAL REQUIREMENTS

4.9.1. Rust removal, rust prevention and coating treatment on the surface of system components.

  1. The external surface of each component of the heating system (except armored parts and purchased components) shall be warm red.
  2. The outer surface of the electric control cabinet is sky blue
  3. The outer surface of other parts (except armored parts and outsourced parts) and the equipment working platform are all industrial gray.

4.10 A SET OF STEEL FRAME PLATFORM FOR EQUIPMENT INSTALLATION (MATERIALS

PROVIDED BY PARTY A AND MADE BY PARTY B)

 


The steel frame platform is used to install this set of equipment, and the steel frame is of 2-layer structure. The mixing tank is placed on the two-story steel platform. We provide the drawing and material list of the steel frame and its fabrication.

 

 

5. LIST OF ACCESSORIES AND SPARE PARTS

NO.NAMESPECIFICATIONQUANTITY
1

THE VACUUM PUMP COMES WITH

ACCESSORIES

VSV-1001 SET
2TANK DOOR SEAL RINGVSV-3001 SET
3

SEAL RING FOR VACUUM AND

MATERIAL PIPELINE

ZJP-3001 SET
4MIXING TANK LID SEAL RING

Φ2400 (AVAILABLE IN

1 YEAR)

1 PIECE
5ELECTRIC HEATING ELEMENTVARIOUS GAUGES1 SET
6TEMPERATURE RESISTANCE400L1 ROOT
7ILLUMINATION OBSERVATION LAMP 2 STICKS
8OBSERVATION WINDOW 2 STICKS

Hot Products

Baosteel B30g120 CRGO Material Coil Basic Info. Model NO. B30P120 Trademark Baosteel Origin China HS ...
Oriented Electrical Steel Grade M4 Used for Dry Type Distribution Transformer Basic Info. Model NO. ...
Baosteel B30p120 CRGO Material Coil Basic Info. Model NO. B30P120 Trademark Baosteel Origin China HS ...
10KVA Jc Cores Wound Cores Power Frequency Transformer for Ocean Transportation Basic Info. Model NO...
10KVA-2500KVA Wound Core for Distribution Transformers Introduction: Our wound cores are widely used ...
Dry-type transformer vacuum epoxy resin casting plant with casting process for Electic inulation ...