Home Companies Chengdu Forster Technology Co., Ltd.

1mw Large Power Pelton Turbine Generator Used In Hydroelectric Power Plant

Chengdu Forster Technology Co., Ltd.
Active Member

Contact Us

[China] country

Address: Building No.4.Zhongtie Xicheng Third East Road of Guanghua, Qingyang District, Chengdu city,Sichuan,CHINA

Contact name:Nancy

Inquir Now

Chengdu Forster Technology Co., Ltd.

1mw Large Power Pelton Turbine Generator Used In Hydroelectric Power Plant

Country/Region china
City & Province chengdu sichuan
Categories Energy Projects
InquireNow

Product Details

1mw High Efficiency Large Power Pelton Hydro Turbine Generator For Hydro Power Plant

 

 

ur main products included:

 

1. Kaplan turbine generators series.

 

2. Turgo turbine generators series.

 

3. Tubular turbine generators series.

 

4. Francis turbine generators series.

 

5. Pelton turbine generators series.

 

Product features:

 

The inlet pipe of the water bucket turbine is composed of a straight section, an elbow pipe, a furcation pipe, a circular contraction flow channel and a fluid guide. The inlet pipe of the multi-nozzle bucket type turbine is a variable-section water pipe with extremely curved and bifurcated water, and a fluid guide is provided in the area where the injection mechanism is installed. Shape: According to the requirements of the water flow velocity at the main pipe portion of the inlet pipe and the fork pipe, the cross-sectional dimension of the inlet pipe gradually decreases from the inlet to the outlet and shrinks. The cross-sectional shape of the inlet pipe is circular or elliptical. Third, the structure of the striking turbine and the main working components (
Spray mechanism (referred to as nozzle)
1 Convert the pressure potential energy of the water flow into the jet flow energy.
2 plays the role of water guiding mechanism. When the needle moves, the annular cross-sectional area between the nozzle outlet and the needle can be gradually changed, so that the over-flow of the nozzle and the flow and power of the turbine can be smoothly changed. Structure: It consists of a nozzle, a needle (also called a needle valve) and a needle moving mechanism. Type: external control type (bent nozzle) and internal control type (straight nozzle).

 

1.suitable for high head,small flow and flow changes in large runoff hydropower station.

 

2.With the power plant investment is small,compact units structure characteristics.

 

3.Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.

 

4.Suitable for high head,small flow station in mountainous area.

 

5.A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.

 

Product parameters:

 

Pelton tubine generator unitGeneratorUnit output (kw)Gevernor or Regulating workValve
Turbine
TypeWater head(m)Discharge (m³/s)Output(kw)Speed (r/min)TypeCapacity (kw)
CJA237/475-1*72000.232383.2750SFW320-8/850320358.3Manual CJWT- I BWT-3000DN300
2200.243440.5SFW400-8/850400414.1
2400.254502SFW500-8/850500474.4
2600.2645721000SFW500-6/850500540.5
2800.274643.5SFW630-6/990630608.1
3000.284714.6SFW630-6/990630675.3
CJA237/475-W-90/1*4.52750.086176.3750SFW160-8/650160162.9Manual CJWT- I BWT-3000DN250
3000.0896200.4SFW200-8/740200185.8
3250.0932225.8SFW200-8/740200209.3
3500.0969252.8SFW250-8/740250235.1
3750.1005279.8SFW250-8/740250260.2
4000.1033091000SFW250-8/740250287.4
4250.1077341.3SFW320-6/740320320.1
4500.1098368.4SFW320-6/740320345.5
5000.119496SFW500-6/850500456Manual CJWT- I BWT-6000
6000.131650SFW630-6/990630610
7000.141823SFW800-6/990800770
CJA237/475-W-90/1*72600.261572 SFW500-8/850500526CJT- IIDN400
2800.271636 SFW630-8/990630585
3000.28700 SFW630-8/990630651
3200.289766750SFW800-8/990800712
3400.298834 SFW800-8/990800775
3600.307899 SFW800-8/990800836
3800.315968 SFW1000-8/11801000900
4000.3271093 SFW1000-6/118010001021.9
4200.3351159 SFW1000-6/118010001189
4400.34312871 nnASFW1250-6/118012501203.3
4600.35113821 uuuSFW1250-6/118012501292.2
4800.3591476 SFW1250-6/118012501380.1
5000.3661567 SFW1600-6/118016001465.1
CJA237/475-W-90/1 x 111000.4333500SFW320-12/990320 BWT-6000 CJWT- IDN400
1200.44455SFW400-12/990400 
1400.478566SFW500-12/990500520.7
1600.511699600SFW630-10/1180630643.1
1800.542836SFW800-10/1180800769.1
2000.572939SFW700-10/1180800863.9
2400.61097750SFW1000-8/118010001020.2
2600.6261275SFW1250-8/143012501192.1
2800.6521451SFW1250-8/143012501356.7
CJA237/475-W-100/1 x111800.536804500SFW800-12/1430800739.6CJWT- 1 BWT-6000DN400
2000.565953600SFW800-10/1180800876.7
2200.5931112SFW1000-10/143010001023
2400.621262SFW1000-10/143010001161
2600.6451406SFW1250-10/143012501293
2800.6691561750SFW1250-10/143012501436
3000.6931733SFW1600-10/143016001594
3200.7151930SFW1600-10/143016001775
3400.7372138SFW2000-10/173020001966
3600.7582315SFW2000-10/173020002129
3800.7792497SFW2000-10/173020002297

 

Product pictures:

 

 

 

 

Company Information
 

 

 
Our workshop
 

 

Advantages

 

 
Packaging & Shipping
 

 

FAQ

 

Q1, Which turbine should I choose?

 Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

 

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more

.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

 

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

 

Q5, What is an acceptable MOQ?

 For this product, our acceptable MOQ is 1 set.

 

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

 

 

Hot Products

Professional Micro Hydro Power Solution Automation Panel Tubular Turbine Generator With our ...
Professional Automation Panel Pump Turbine With 10 Years of Technology Research Experience With our ...
Small Turgo Water Turbine generator 55-200 Kw china rc Jet Turbine Engine For Sale Our main products ...
Mini Hydroelectric Generator Water Turbine 20KW 30KW 50KW For Power Station Our main products ...
100KW To 700 KW Turgo Type Deriaz Turbine Generator With Governor Our main products included: 1. ...
Mini Hydro In Line Water Turbine Generators From 3 To 5kw For Sale Our main products included: (1) ...