Chengdu Forster Technology Co., Ltd. |
|
High Efficiency Alternative Energy Hydro PeltonTubine Generator Automation Control Hydropower Project For Hpp
Our main products included:
1. Kaplan turbine generators series.
2. Turgo turbine generators series.
3. Tubular turbine generators series.
4. Francis turbine generators series.
5. Pelton turbine generators series.
Product features:
The difference between the water-conducting mechanism in the impact
turbine, the nozzle is equivalent to the water-conducting mechanism
of the counter-turbine, its role is: to guide the water flow,
adjust the flow, And convert liquid mechanical energy into jet flow
energy. The water guiding mechanism of the counter-turbine turbine
not only guides the water flow, but also regulates the flow rate,
and forms a certain rotating water flow before the runner to meet
the requirements of the turbines of different specific speeds on
the front ring of the runner.
In the impact turbine, the difference between the relative position
of the working jet and the runner and the number of work times can
be divided into: Strike turbine (water bucket type, the most widely
used), the double-turbine turbine of the turbulent turbine, the
impact turbine and The similarities and differences of the
counter-type water wheel, the working principle of the same point
impact turbine and the counter-turbine are all based on the force
of the water flow and the rotor blade and the principle of the
reaction force to transmit the water flow energy to the runner, so
that the rotation of the runner is released. Mechanical energy.
Main types of impact turbines and their working characteristics II.
Similarities and differences between impact turbines and
counter-attack waterwheels III. Structure and main working
components of shear turbines I. Main types of impact turbines and
their working characteristics Impact turbines The special water
guiding mechanism (nozzle) draws a free jet with kinetic energy,
rushes to the runner water bucket, and rotates the runner to do
work, thereby completing a hydraulic prime mover that converts
water energy into mechanical energy.
CJ237-W-65/1x7.5 Hydro Tubine Performance Data And Supporting Table | |||||||||||
Model | Turbine Parameters | Generator Parameters | Driving mode | Speed Way | Water Intake | ||||||
Design head(m) | Under the design head | Design speed (r/min) | The power of generator | Rated speed(r/min) | Runaway speed(r/min) | Vavel control | Guide vane control | Diameter (mm) | |||
Flow rate (m3/s) | The output(kw) | ||||||||||
CJ237-W-65/1x7.5 | 50 | 0.134 | 53 | 410 | 55 | 750 | 1500 | Direct connection or Belt connection | automatic/Manual | Z41H-2.5 | 300 |
60 | 0.148 | 69.7 | 150 | 55 | 750 | 1500 | automatic/Manual | “ | |||
70 | 0.159 | 89.8 | 486 | 75 | 750 | 1650 | “ | ||||
80 | 0.17 | 108 | 520 | 100 | 500 | 900 | automatic/Manual | “ | |||
90 | 0.181 | 129 | 550 | 125 | 600 | 1080 | “ | ||||
100 | 0.19 | 152 | 580 | 125 | 600 | 1080 | automatic/Manual | “ | |||
110 | 0.199 | 174 | 610 | 160 | 600 | 1080 | “ | ||||
120 | 0.208 | 197 | 636 | 200 | 600 | 1080 | automatic/Manual | “ | |||
130 | 0.214 | 220 | 662 | 200 | 600 | 1350 | “ | ||||
140 | 0.225 | 250 | 688 | 250 | 750 | 1350 | automatic/Manual | “ | |||
150 | 0.233 | 279 | 713 | 250 | 750 | 1350 | “ | ||||
160 | 0.241 | 308 | 736 | 320 | 750 | 1350 | automatic/Manual | “ | |||
170 | 0.248 | 355 | 758 | 320 | 750 | 1350 | “ | ||||
180 | 0.254 | 362 | 779 | 320 | 750 | 1350 | automatic/Manual | “ | |||
190 | 0.262 | 390 | 800 | 400 | 750 | 1350 | “ | ||||
200 | 0.269 | 422 | 820 | 400 | 750 | 1350 | automatic/Manual | “ | |||
210 | 0.275 | 448 | 840 | 400 | 750 | 1350 | “ | ||||
220 | 0.282 | 448 | 860 | 400 | 750 | 1350 | automatic/Manual | “ | |||
230 | 0.288 | 518 | 880 | 500 | 1000 | 1800 | “ | ||||
240 | 0.294 | 557 | 900 | 500 | 1000 | 1800 | automatic/Manual | “ |
Installation picture:
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?