Home Companies Chengdu Forster Technology Co., Ltd.

75kw Dual Wheel Dual Jet Hydroelectric Turbine Generator 55.1 - 246.5kw Output

Chengdu Forster Technology Co., Ltd.
Active Member

Contact Us

[China] country

Address: Building No.4.Zhongtie Xicheng Third East Road of Guanghua, Qingyang District, Chengdu city,Sichuan,CHINA

Contact name:Nancy

Inquir Now

Chengdu Forster Technology Co., Ltd.

75kw Dual Wheel Dual Jet Hydroelectric Turbine Generator 55.1 - 246.5kw Output

Country/Region china
City & Province chengdu sichuan
Categories Energy Projects
InquireNow

Product Details

High Pressure Governor Butterfly Valve Automatic Control 200kw Micro Hydro Electric Turgo Turbine Generator For Hpp

 

 

Our main products included:

 

1. Kaplan turbine generators series.

 

2. Turgo turbine generators series.

 

3. Tubular turbine generators series.

 

4. Francis turbine generators series.

 

5. Pelton turbine generators series.

 

Product features:

 

Turgo turbine mainly composed of a nozzle and a runner. The runner consists of an outer rim, An inner hub and a number of single bowl - shaped buckets fixed by the question. The nozzle jet ramps the blade on the front side of the wheel at an Angle of 22.5 ° and then flows out from the back. The Structure is simple, the cost is low, but the efficiency is low. Only for small power stations. Applicable head is 20~100 m, even higher.

However, Pelton turbine is more commonly used with high head, because Pelton turbine has higher efficiency and wider range of head than Turgo turbine. However, the price of Turgo turbine is more economical than that of Pelton turbine. This is mainly based on the actual situation of the customer, and then our engineers choose the design.

 

1. Horizontal unit has the advantages of simple structure,convenient repair,reduce the plant height,advantages in reducing excavation depth.

 

2. The vertical unit with plant plane size small,a runner can be provided with a plurality of nozzles,(at most can be installed six nozzles),high specific speed,the same size as units of capacity is relatively small,light weight and so on.

 

Product features:

 

XJ02-W-40/1 x 11 turbine performance data and supporting table
ModelTurbine ParametersGenerator ParametersDriving modeSpeed WayWater Intake
Design head(m)Under the design headDesign speed (r/min)The power of generatorThe runaway speedRated speed(r/min)manuallyautomaticModeldianeter
Flow rate (m3/s)The output(kw)
XJ02-W-40/1 x 11350.20855.1592556001320Direct connectionmanuallyYTT-Z41 H-300
400.22367.6632556001320#####
450.23679.5371756001320#####
500.24993.4707757501650#####
550.261108.97411007501650#####
600.273124.57751007501650#####
650.284139.48061257501650#####
700.295154.68371257501650#####
750.305169.28661607501350#####
800.315185.989416010002200#####
850.32520692220010001800#####
900.334225.694920010001800#####
950.343246.597520010001800#####

 

Product pictuers:

 

 

Company Information
 

Our workshop
 

Advantages
 

Packaging & Shipping
 

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

 

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

 

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

 

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

 

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

 

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

 

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

website address: www.fstgenerator.com

 

 


 

Hot Products

Professional Micro Hydro Power Solution Automation Panel Tubular Turbine Generator With our ...
Professional Automation Panel Pump Turbine With 10 Years of Technology Research Experience With our ...
Small Turgo Water Turbine generator 55-200 Kw china rc Jet Turbine Engine For Sale Our main products ...
Mini Hydroelectric Generator Water Turbine 20KW 30KW 50KW For Power Station Our main products ...
100KW To 700 KW Turgo Type Deriaz Turbine Generator With Governor Our main products included: 1. ...
Mini Hydro In Line Water Turbine Generators From 3 To 5kw For Sale Our main products included: (1) ...