Home Companies Hongya Power Generating Equipment To Utilities Limited

Forged Steel Mini Hydro Water Turbine Generator Brushless 2500kw

Hongya Power Generating Equipment To Utilities Limited

Contact Us

[China] country

Trade Verify

Address: Anxi village, Yuping town,Hongya county, China

Contact name:Jack shen

Inquir Now

Hongya Power Generating Equipment To Utilities Limited

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Forged Steel Mini Hydro Water Turbine Generator Brushless 2500kw

Country/Region china
Categories Energy Projects
InquireNow

Product Details

2500kwmini Hydro Generator For Micro Hydro Power Plant

 

overview 

 

Hydro-generating unit is the key power equipment in the hydropower plant.

The hydro generator is a device that converts the rotating mechanical energy of a hydro-turbine into electrical energy through a main shaft connected to the hydro-turbine runner. two different mount for generator of vertical and horizontal which could be operated at brushless excitation and thyristor excitation. the hydro generator has usually used air as medium to cool its stator, rotor winding and iron core.

 

Specification

 

Name2500kw Hydropower Electricity Turbine Generator
Capacity22500KW
Frequency50HZ
Generator Voltage6300V
Layout patternvertical
Material(coil)copper
ExcitationBrushless
Generator InsulationF/F
Lifespan50 years
 

 

our service package for hydro power plant

 

1. The Argumentation of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3. Equipment Purchase& Transportation
a. Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling) (Optional)
b. Regular maintenance and inspection (Optional)
c. Technical Training Program for Power Plant Personnel (Optional)
d. General Overhaul (Optional)
6. Installation & Testing
a. Installation & testing for all systems & equipment provided by Runh Power
b. Installation, testing & trail run of all systems of a power plant (Optional)
c. Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.(

 

Hot Products

Product Description: Francis Hydro Turbine The Francis Hydro Turbine is a highly efficient and ...
Product Description: Features: Product Name: Francis Hydro Turbine Rated Flow: 0.3-100m3/s Rated ...
Product Description: Francis Hydro Turbine - Efficient and Powerful The Francis Hydro Turbine is a ...
Product Description: Francis Hydro Turbine The Francis Hydro Turbine is a cutting-edge water turbine ...
Product Description: Francis Hydro Turbine - A Modern Francis Turbine for Efficient Hydropower ...
Product Description: Francis Hydro Turbine - Product Overview The Francis Hydro Turbine, manufacture...