Home Companies Hongya Power Generating Equipment To Utilities Limited

0.8m Water Turbine Parts Turgo Wheel For Hydroelectric Generator

Hongya Power Generating Equipment To Utilities Limited

Contact Us

[China] country

Trade Verify

Address: Anxi village, Yuping town,Hongya county, China

Contact name:Jack shen

Inquir Now

Hongya Power Generating Equipment To Utilities Limited

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

0.8m Water Turbine Parts Turgo Wheel For Hydroelectric Generator

Country/Region china
Categories Generator Parts & Accessories
InquireNow

Product Details

Stainless Steel Water Turbine Parts Turgo Wheel For Generator

 

The Turgo wheel is basically an improved version of the Pelton.The maximum efficiency of animpulse wheel is achieved when the velocity of the runners at the centerline of the nozzle is half the velocity of the incoming water. To achieve the highest velocities the ratio of the diameter of the wheel and thediameter to the center of the nozzle should be as small as possible..The wheel has a minimum ratio of 9:1, the Turgo has a minimum ratio of 4:1. The Turgo is half the size of the Pelton and operates at twice thespeed. This makes the unit cheaper and reduces the amount of gearingnecessary. The Turgo has an efficiency of over 80% and runs on head of 40 feet or more.

 

specification

 

runner materialstainless steel
runner typeKaplan
diameter0.8 m
capacity200kw
blade No18PCS
weight400KG
 

The package of Project


a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b.Regular maintenance and inspection
c.Technical Training Program for Power Plant Personnel
d.General Overhaul
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant
c.Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.

 

Hot Products

Product Description: Francis Hydro Turbine The Francis Hydro Turbine is a highly efficient and ...
Product Description: Features: Product Name: Francis Hydro Turbine Rated Flow: 0.3-100m3/s Rated ...
Product Description: Francis Hydro Turbine - Efficient and Powerful The Francis Hydro Turbine is a ...
Product Description: Francis Hydro Turbine The Francis Hydro Turbine is a cutting-edge water turbine ...
Product Description: Francis Hydro Turbine - A Modern Francis Turbine for Efficient Hydropower ...
Product Description: Francis Hydro Turbine - Product Overview The Francis Hydro Turbine, manufacture...