Home Companies Hongya Power Generating Equipment To Utilities Limited

7000kw Kaplan Turbine Runner Blades High Strength Water Turbine Parts

Hongya Power Generating Equipment To Utilities Limited

Contact Us

[China] country

Trade Verify

Address: Anxi village, Yuping town,Hongya county, China

Contact name:Jack shen

Inquir Now

Hongya Power Generating Equipment To Utilities Limited

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

7000kw Kaplan Turbine Runner Blades High Strength Water Turbine Parts

Country/Region china
Categories Energy Projects
InquireNow

Product Details

stainless steel Francis runner

 

Kaplan Turbine works on the principle of axial flow reaction. In axial flow turbines, the water flows through the runner along the direction parallel to the axis of rotation of the runner. The water at the inlet of the turbine possesses both kinetic energy as well as pressure energy for effective rotation the blades in a hydro-power station.

Polishing based on CMM measurement report

Experienced employees polishing according to customer specific procedures

Several dimensional and quality controls through process

Compliance with all environmental standards thanks to the newest filtering technologies

Completed products are checked using four non-destructive testing methods (NDT). 

Visual Testing (VT)

Liquid Penetrant Testing (PT)

Magnetic Particle Testing (MT)

Ultrasonic Testing (UT)

The actual unbalance is displayed in one or two planes by graphical and numerical output. There is also a deviation from the allowed unbalance displayed and a suggestion for the most convenient weight correction.

 

specification

 

runner materialstainless steel
runner typeKaplan
diameter1.2m
capacity7000kw
blade No4PCS
weight1400KG
 

The package of Project


a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3. Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b. Regular maintenance and inspection
c.Technical Training Program for Power Plant Personnel
d. General Overhaul
6. Installation & Testing
a. Installation & testing for all systems & equipment provided by Runh Power
b. Installation, testing & trail run of all systems of a power plant
c. Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.

 

Hot Products

Product Description: Francis Hydro Turbine The Francis Hydro Turbine is a highly efficient and ...
Product Description: Features: Product Name: Francis Hydro Turbine Rated Flow: 0.3-100m3/s Rated ...
Product Description: Francis Hydro Turbine - Efficient and Powerful The Francis Hydro Turbine is a ...
Product Description: Francis Hydro Turbine The Francis Hydro Turbine is a cutting-edge water turbine ...
Product Description: Francis Hydro Turbine - A Modern Francis Turbine for Efficient Hydropower ...
Product Description: Francis Hydro Turbine - Product Overview The Francis Hydro Turbine, manufacture...