Hongya Power Generating Equipment To Utilities Limited |
Verified Suppliers
|
|
stainless steel Francis runner
Kaplan Turbine works on the principle of axial flow reaction. In axial flow turbines, the water flows through the runner along the direction parallel to the axis of rotation of the runner. The water at the inlet of the turbine possesses both kinetic energy as well as pressure energy for effective rotation the blades in a hydro-power station.
Polishing based on CMM measurement report
Experienced employees polishing according to customer specific procedures
Several dimensional and quality controls through process
Compliance with all environmental standards thanks to the newest filtering technologies
Completed products are checked using four non-destructive testing methods (NDT).
Visual Testing (VT)
Liquid Penetrant Testing (PT)
Magnetic Particle Testing (MT)
Ultrasonic Testing (UT)
The actual unbalance is displayed in one or two planes by graphical and numerical output. There is also a deviation from the allowed unbalance displayed and a suggestion for the most convenient weight correction.
specification
runner material | stainless steel |
runner type | Kaplan |
diameter | 1.2m |
capacity | 7000kw |
blade No | 4PCS |
weight | 1400KG |
The package of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the
request or Runh Power's recommandation or the request from the
commissioner.
b. Design of overall layout and all the sub-systems within the
parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review
and approval.
3. Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing
water collector, deaerator, high pressure and low pressure
superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other
necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power
plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b. Regular maintenance and inspection
c.Technical Training Program for Power Plant Personnel
d. General Overhaul
6. Installation & Testing
a. Installation & testing for all systems & equipment
provided by Runh Power
b. Installation, testing & trail run of all systems of a power
plant
c. Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.