Home Companies Hongya Power Generating Equipment To Utilities Limited

180KW Mini Kaplan Turbine Stainless Steel 50HZ Brushless

Hongya Power Generating Equipment To Utilities Limited

Contact Us

[China] country

Trade Verify

Address: Anxi village, Yuping town,Hongya county, China

Contact name:Jack shen

Inquir Now

Hongya Power Generating Equipment To Utilities Limited

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

180KW Mini Kaplan Turbine Stainless Steel 50HZ Brushless

Country/Region china
Categories Energy Projects
InquireNow

Product Details

vertical 180kw mini Kaplan hydraulic turbine generator for power plant

 

overview

 

Advantage of products: It is fit for the power station with middle and low head and the output has the sweeping change, can run steadily and high-efficient under various kinds of operating modes. It is equipped with a vertical shaft, roll bearing seat or sliding bearing seat. There are four different types of this kind in which there is open channel intake type, open channel intake with pressure type, all closed metallic spiral casing intake and concrete spiral casing intake.
Supply Flancis, Kaplan/Propeller, Tubular and Pelton Hydro-turbine generator unit, which can use for all kinds of water heads, our supplying ability can be up to 100MW. The complete set of Mechanical & Electric equipment from Water to Wire is also our supply range.
A first-class technical service and installation team can provide quality installation service and good after-sales service.

 

Specification

 

Name180kw mini Kaplan hydraulic turbine generator
Water Head6.06.0 m
Runner Diameters0.4 m
Capacity180KW
Frequency50HZ
Generator Voltage400V
Layout patternvertical
Material(blades)Stainless Steel ZG0Cr13Ni4Mo
ExcitationBrushless
Generator InsulationF/F
Lifespan50 years

 

The package of Project


a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b. Regular maintenance and inspection
c. Technical Training Program for Power Plant Personnel
d. General Overhaul
6. Installation & Testing
a. Installation & testing for all systems & equipment provided by Runh Power
b. Installation, testing & trail run of all systems of a power plant
c. Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.

 

Why choose us?

1. More than 20 years of industry experience, install commissioning more than 150 equipment each year

2. Provide complete proposal for hydro power plant from water to wire

3. Abundant foreign power plant project implementation experience such as France, Japan, USA, South Africa, Sri Lanka, Iran, Southeast Asia

4. Design and manufacture of hydro power generator with voltage 400V,6.3KV . capacity exceed 1000kw with 400V

 

 

FAQ

 

1. You are a trading company or a manufacture?

We are a hydro turbine generator manufacture with over 20 years of experiences, Our factory is in the Sichuan you will take 2 hours driving after you reach Shuangliu Airport, pay a visit to our factory you will know more about us.

2. What Kind of water turbine should I choose?

We need to know water head, flow rate, voltage level, frequency, on-grid or off-grid running, automation level from you to work out the solution

3: Can you do the EPC for the hydro power plant?

Yes, We can design, producing and install the equipment, we will dispatch technologist and workers to install the equipment.

 

 

Hot Products

Product Description: Francis Hydro Turbine The Francis Hydro Turbine is a highly efficient and ...
Product Description: Features: Product Name: Francis Hydro Turbine Rated Flow: 0.3-100m3/s Rated ...
Product Description: Francis Hydro Turbine - Efficient and Powerful The Francis Hydro Turbine is a ...
Product Description: Francis Hydro Turbine The Francis Hydro Turbine is a cutting-edge water turbine ...
Product Description: Francis Hydro Turbine - A Modern Francis Turbine for Efficient Hydropower ...
Product Description: Francis Hydro Turbine - Product Overview The Francis Hydro Turbine, manufacture...