Home Companies DONGGUAN HUAXIAN LTD.

Cold Room Compressor Condensing Unit 2HP Medium Temperature 0~+10°C

DONGGUAN HUAXIAN LTD.

Contact Us

[China] country

Trade Verify

Address: No.588, Huixing Industrial District, Datang, Dalingshan, Dongguan City, Guangdong, China

Contact name:Huya Ye

Inquir Now

DONGGUAN HUAXIAN LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Cold Room Compressor Condensing Unit 2HP Medium Temperature 0~+10°C

Country/Region china
City & Province dongguan guangdong
InquireNow

Product Details

2HP Medium Temperature Cold Room Compressor Condensing Unit

 

The compressor condensing unit is an equipment device composed of one or more refrigeration compressors, condensers, and necessary auxiliary equipment (excluding evaporators and throttling devices).

 

The auxiliary equipment that constitutes the device includes gas-liquid separator, oil separator, filter, sight glass, valve, shock absorber, etc. Compression condensing units are a type of refrigeration equipment that can be divided into water-cooled, evaporative cooled, and air-cooled according to their cooling methods. The water-cooled unit can only be used in conjunction with a water pump and cooling tower.

 

According to the structural types of refrigeration compressors, they are divided into open type, semi closed type, and fully closed type units, as well as piston type units, screw type units, etc.

 

Compressor condensing unit is integrated box type which can be put outdoor directly.

 


 

Installation

 

The compression condensing unit should be installed after the concrete reaches the curing strength, the surface is flat, and the position, size, elevation, reserved holes and embedded parts meet the design requirements. When hoisting the equipment, care should be taken to stabilize the equipment with pads to prevent deformation of the equipment; during the lifting process, the main load-bearing point should be higher than the center of gravity of the equipment to prevent tilting during hoisting; the base of the unit should also be prevented from twisting and deforming.

 

The turning point of the sling and the contact part of the equipment should be cushioned with soft materials to avoid damage to equipment, pipelines, instruments, accessories, etc. and scratch the paint. After the equipment is in place, it should be leveled and aligned. The allowable deviation of the vertical and horizontal levelness of the fuselage should not be greater than 0.2‰, and the measurement position should be on the exposed part of the vertical shaft or other references; for the compression condensing unit with the lower common base, an appropriate position can be selected as the reference surface in the main engine structure.

 


 

Components

No.NameBrand
1CompressorCOPELAND
2Condenser

KAILAILI or YONGQIAN

3FilterDANFOSS
4Ball valveDANFOSS
5Solenoid valveDANFOSS
6Sight glassDANFOSS
7Pressure controllerDANFOSS
8Pressure gaugeREFCO

 


 

Parameter

No.NameParameter
1Horse power2HP
2Cooling capacity4.4kw
3Power2.2kw
4Power supply380V/50Hz/3Phase, or recommend
5TemperatureMedium 0~+10°C
6Size

L950*W350*H870mm

 


 

Product Picture for Reference

 

 


 

Successful Case

 

 


 

FAQ:

1.Can the refrigeration unit be customized?

  • Yes. The refrigeration unit (compressor condenser unit) can be customized according to customer's requirement.

 

2.Can the refrigeration unit be made single phase?

  • Yes. But the max compressor for single phase is 3HP. More than 3HP, it should be 3 phase.

 

3.Can the refrigeration unit be place outdoor?

  • Yes. Our compressor condenser unit is box type. We still recommend building a shed for it, which will keep it safe from severe weather.

 

4.How's the package of shipment?

  • The compressor condenser unit is packaged by wooden frame for safety shipment.

 

5.What's the payment terms?

  • By T/T, 30% deposit, 70% will be paid before shipment.

 

6.What's the lead time?

  • The production lead time is 30 working days, plus 30 days shipping time. Some countries will be longer for sailing.

 

 

 

 

Hot Products

Automatic Operation 1500kgs 3 Pallet Fast Cooling Leafy Vegetable Vacuum Cooler Introduction The ...
100kgs Small sliding Door Cooked Food Vacuum Cooler For Kitchen Introduction In order to prolong the ...
200kgs 30mins Rapid Cooling Cooked Food Vacuum Cooler For Rice, Noodle, Soup Introduction The cooked ...
300kgs 10mins Rapid Pre Cooling Bread Vacuum Cooler For Bakery Introduction After the bread is ...
120kgs Stainless Steel Rice Vacuum Pre Cooling Machine For Cold Areas Introduction Place hydrated ...
100 Square Meter High Quality Food Grade -18­°C Stainless Steel Frozen Meat Freezer Room Introductio...