DME HASCO Plastic Injection Molded Rubber Product Mold Design
Polish Surface
Working Process
1 . R&D
Customer sends us sample or drawings, we do modification as per
customer's need.Some professional suggestion to help customer
improve the product details
2 . Discussion
Discuss the options for the project,such as mold steel,plastic
material,delivery time, ect.
3 . Details confirmation
Customer confirms the plastic material, machines used,and the some
requirements on details.
4 . Mould Design
We make mould design according to customer's machine and
requirements.
5 . Mold Tooling
Start to make mold, Cut steel, CNC machining, polishing,
sampling,etc.
6 . Mold Processing
Share some mould process photos to customer to keep customer
posted.
7 . Sample and delivery
T0 - T1: Checking if mould running ok, the dimensions, weight, wall
thickness to meet customer requirements.
After all is ok, we will send samples to customer approve.
Product Description
Brand | Moldie |
Model | Customized |
Mold Base | LKM, C50 standard mold base or other you want |
Mold Material | H13, 1.2344, 1.2738 and so on to be chosen |
Standard | HASCO, DME, MISUMI, PUNCH |
Product Material | ABS, PC, PVC, PA66, POM or other you want |
Certificated | ISO 9001:2008 Certificated, GSG Certificated |
Our professional engineers team design, make and check the mold in
each step
Our engineers follow the molds' production every week to make sure
all of them are in schedule;
After trial production, we will check the samples to make sure all
are right
We will send the sample and dimension report to our clients for
approval
After everything is ok, we will do final inspection on the molds
and products
Plastic mould advantages
Professional design team
Professional mold design team
Professional mold making machines
Professional mould and product QC and tec. team
Rich mould making experience with different clients from various
country
Product Shipment
1 . Packaging : pack the parts into the transparent bag,and place
the bags into the carton box one by one . Common packaging: pack
the parts into the transparent plastic bag
2 . Shipping method: By sea or by air according to customer's need.
3 . Loading port: Guangzhou Port or Shenzhen Port of the Guangdong
Province.
4 . Shipping way: By air (3-6 days), or by sea (15-35 days).
Our Services
1. 3d Design/Samples for quotation According to 3D drawing or
samples for quotation.
2 .Negotiations Including the price of moulds, moulds sizes,
material for cores & cavities, weight of product, part cost,
payment, moulds lifetime, delivery, etc.
3. Purchasing Order After the customer confirming the mould design
and quotation.
4. Making mold(moulds) Confirm drawing, start to do DFM,mold flows
and mold detail agreed with the customer, start production.
5. Production schedule Every week we will feedback to the customer
a mold progress.
6. sample shoot We provide the moulds test samples for
confirmation(about 10-15 piece), then, get your signature sample
,mass production.
7. Package Wooden case for moulds, cartons for parts ,or as your
requiretment.
8. Delivery deliver goods by air or by sea.