Home Companies Shenzhen Coming Technology Co., Ltd.

50 Watts 70ra 150lm/w IP66 Led Bulkhead Lights For Mining

Shenzhen Coming Technology Co., Ltd.
Active Member

Contact Us

[China] country

Address: Coming Innovation Park, No.25, Changjin Road, Longgang District, Shenzhen, China

Contact name:Sasha Zhou

Inquir Now

Shenzhen Coming Technology Co., Ltd.

50 Watts 70ra 150lm/w IP66 Led Bulkhead Lights For Mining

Country/Region china
City & Province shenzhen guangdong
InquireNow

Product Details

50 watts 2700 - 6500k 70ra 150lm/w Led Bulkhead Lights for mining

 

 

 

  • Specification:

Power50w
Lamp Luminous Flux160LM/W±5%
IP GradeIP66
IK GradeIK 10
CCT2700-6500K
CRI(ra>)70/80
Beam AngleAsymmetric G5
Rated VoltageAC 100-240V 277V~, 50/60Hz
Working lifetime(hour)50000
Lamp body materialAluminum

 

 

 

 

 

 

  • Feature Advantage:

1. Excellent LED heat sink has perfectly replaced the traditional lamp.

2. Energy Saving Effect is Obvious , saving above 50%-70% energy compared with sodium and Halogen.

3. The energy-saving cutting edge innovation fills the gap in the led heat sink market.

4. Easy to install, solid in structure, super heat dissipation.

 

 

LED Flood Light CO-B300-50W

 

 

 

 

 

  •  Trade Terms

1. Shipping freight is quoted under your requests.

2. Shipping port: Shenzhen, China mainland.

3. Lead time: 3-5 working days for samples, 7-15 working days for big quantity.

4. Discounts are offered based on order quantities.

5. Logo: According to your requirements.

6. MOQ: 1pcs.

 

  •  FAQ:

1. Delivery Time:

Normal 15 days after order confirming. Some items maybe more faster

2. Payment Terms:

T/T 30% deposit after order confirmed, the balance after goods ready

3. OEM:

OEM Service is available.

4. Shipping Ways:

By Express: DHL, UPS, EMS, TNT, etc.

By Air: Please let us know the airport.

By Sea : Please let us know the seaport.

DHL,UPS, FEDEX, EMS etc.

 

  • Shipping

We Ship to Worldwide, except APO/FPO.

Items are shipped from China using Airmail, reach most of the countries within 10 to 20 business days.

Delivery time depends on destination and other factors, it may takes up to 20 business days.

 

  • SNS:

Facebook: https://www.facebook.com/COMING.Lighting

Linkedin: https://www.linkedin.com/company/shenzhen-coming-technology-co-ltd

Twitter:https://twitter.com/LED_GCOMIN

INS: https://www.instagram.com/coming_lighting

 

Hot Products

High CRI >70 X300 ce rohs Indoor Led Linear Light with factory Parameter Name LED Linear Light Power ...
30 watt 2700 - 6500k 150lm/w X300 warehouse Led Linear Light Parameter Item type Power LED Quantity ...
Indoor Linear Light X300 60watt 1.2m 150w/m Ceiling and Suspended Parameter​ Item type LED Linear ...
CE Rohs 60 Watt 2700-6500K Linear Light X300 150w/m ra > 70 Parameter​ Name Linear Light Power 60W ...
Suspended & Ceiling 20w x 2 LED Linear Lighting 6000lm CE ROHS Parameter​ Wattage Lamp Efficiency ...
High quality aluminum 30w x 2 LED Linear Light for office ceiling lighting Parameter​ Wattage Led ...