Home Companies Qingdao Xinguangzheng Global Engineering Co.,Ltd

Two Floors Prefab Steel Structure Building With C/Z Purlin

Qingdao Xinguangzheng Global Engineering Co.,Ltd

Contact Us

[China] country

Trade Verify

Address: No.268, Shenzhen Road, Pingdu, Qingdao City, Shandong Province, China

Contact name:james

Inquir Now

Qingdao Xinguangzheng Global Engineering Co.,Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Two Floors Prefab Steel Structure Building With C/Z Purlin

Country/Region china
City & Province qingdao shandong
InquireNow

Product Details

Two Floors Steel Building

Project name: Anguilla Office
Project classification: two floors steel building
Project address: Anguilla

Project Description

Project name: Anguilla Office

Project classification: two floors steel building

Project address: Anguilla

Steel structure Buildings is widely used in production field, Compare with traditional concrete and brick building, it has advantages of shorter erection time, environmentally friendly, recycled used etc characteristics.
The main types includes workshop, warehouse, garage, hangar, multi-storey buildings, chicken house, cow shed, sheep shed, prefab container house etc.

 

Advantages of Prefab Steel Structure Buildings:

Reduction in Construction Time

Buildings are typically delivered in just a few weeks after approval of drawings. Foundation and anchor bolts are cast parallel with finished, ready for the site bolting. The use of PEB will reduce the total construction time of the project by at least 50%. This also allows for faster occupancy and earlier realization of revenue.

 

Lower Cost

Due to the systems approach, there is a significant saving in design, manufacturing and on-site erection cost. The secondary members and cladding nest together reducing transportation cost.

 

Flexibility of Expansion

Buildings can be easily expanded in length by adding additional bays. Also,expansion in width and height is possible by pre-designing for future expansion.

 

Quality Control

As buildings are manufactured completely in the factory under controlled conditions the quality is assured.

A pre-engineered steel building is a modern technology where the complete designing is done at the factory and the building components are brought to the site and then fixed/jointed at the site, all is bolt connection, no need any welding!.

An efficiently designed pre-engineered building can be lighter than the conventional steel buildings by up to 30%. Lighter weight equates to less steel and potential price savings in structural framework.

 

Product Name

Prefab Steel Structure Building

Main Frame

H Steel or Square Tube

Secondary Structure

C/Z Purlin, Tie Rod, X Brace etc

Roof & Wall Panel

Color Steel Sheet

Insulated Sandwich panel

Window

Aluminium Alloy Window

Door

Swring Door, Roller Door, Sliding Door

Accessories

Anchor Bolt, Self tapping screw etc

 

Hot Products

ENTERPRISE MISSION: GIVE CLIENTS HAPPINES! Our company, Xinguangzheng (XGZ) Group, has six factories...
Project name: Qingdao Hall Project classification: Steel structure supermarket Project address: ...
ENTERPRISE MISSION: GIVE CLIENTS HAPPINES! Our company, Xinguangzheng (XGZ) Group, has six factories...
ENTERPRISE MISSION: GIVE CLIENTS HAPPINES! Our company, Xinguangzheng (XGZ) Group, has six factories...
Steel Structure Cold Storage Project name: steel structure cold storage Project address: Uzbekistan ...
Project name: Australian warehouse Project classification: Prefab steel structure warehouse Project ...