Foshan Glawall Building Materials Co., Ltd |
Verified Suppliers
|
|
Type | 108 series 12mm+12mm double layer glass frameless |
Frame material | clear anodized 6063-T6 aluminum |
Sound insulation | 45-48db |
Characteristic | latest European style, full view panorama type |
Style | 1. Aluminium frame+single glass 2.Aluminium frame+double glass 3.Aluminium frame+composed panel/wood panel 4.Aluminium frame+single glass/double glass+composed panel/wood panel |
Advantage | we have strong sales team, Large factory area, Mature production line, Professional QC, Good packing, R&D team, Quality guarantee, Nice after sales service, Pre-fabricated labeling |
Weight | 25-35 kg/m2 |
The installation steps for demountable partition walls can vary depending on the specific type and design of the walls. However, here is a general overview of the typical installation process:
Preparation: Prepare the area where the partition walls will be installed by ensuring that the floor is clean and level.
Measurement and Layout: Measure and mark the layout of the partition walls on the floor and ceiling, ensuring that they are positioned correctly.
Install Tracks: Install the top and bottom tracks along the marked lines on the floor and ceiling. The tracks serve as guides for the partition panels.
Install Panels: Slide the partition panels into the tracks, starting from one end and working your way across. Make sure the panels fit snugly and are aligned properly.
Connect Panels: Connect the panels together using connectors or clips to secure them in place. Ensure that the panels are level and aligned correctly.
Add Finishing Touches: Install any finishing touches, such as trim or seals, to the edges of the walls for a clean and professional look.
Test and Adjust: Test the walls to ensure that they are securely installed and functioning properly. Make any necessary adjustments to ensure that the walls are level and aligned correctly.
Final Inspection: Once the walls are installed, inspect them to ensure that they meet the design and quality standards.
Clean Up: Remove any debris or materials from the installation area and clean the walls to prepare them for use.
It's important to follow the manufacturer's instructions and guidelines for the specific type of demountable partition walls being installed to ensure a successful installation.
More details and consultance,please contact with project sales:
E-mail: helen@glawall.com
What'sAPP: +86 13794317605
Factory address: No.3 Sanheng Road, Xiqiao Industrial Zone, Shatou
Village, Jiujiang Town, Nanhai District, Foshan City, Guangdong
Province.
Welcome to visit our factory