Home Companies Dongguan Zehui machinery equipment co., ltd

PLC Control EPE Foam Sheet Extrusion Line , PU Foam Manufacturing Machines

Dongguan Zehui machinery equipment co., ltd

Contact Us

[China] country

Trade Verify

Address: Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China

Contact name:Wang

Inquir Now

Dongguan Zehui machinery equipment co., ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

PLC Control EPE Foam Sheet Extrusion Line , PU Foam Manufacturing Machines

Country/Region china
City & Province dongguan guangdong
InquireNow

Product Details

 

Full-Auto Batch Box Polyethylene Foam Production Line / Equipment 230kg / h

 

Specification


This machine is mostly used to produce large-scale continuously foaming production (density is about 6 to 100 kg/m3 ) . It adopts the advanced touch screen and PLC Operation System , its automatization level is high , the production is low-cost and the quality fo foam is outstanding .


It is the most ideal equipment for large-scale foaming produce . Man-machine interface , non-stop the machine can change formulas , it can produce the British elevation high-slow rebound , electronic cotton , brassieres cotton , polyester cotton , yellow-resistant up to 3-5 level , add powder 10 to 200 parts , the lowset density 6-100 , it also can produce on machine .

 

Main technique specification:

 

Dimension

Total length 35m×Total width 4m×Total Height 3m

 

Foaming material Group13 groups, man-machine interface, both manual and automatically computer control
Foaming width

980mm~2250mm

Foaming height

Max 1200mm

Foaming density

8Kg/m³~100kg/m³

Foaming speed

2000r/min~7000r/min

Max total output

300kg/min

 

Material spraying way

① The way of down sprayer head (upper, down, front, back can be adjusted) 

② the way of trough overflow pipe.

Controlling way of foaming

① PLC controlling, can continuously foaming two different formulas in one time

② All inverter controlling foaming and work in phase with the production line

③ Oven declining board height and width can be adjusted by control box.

④ Oven side links width can be adjusted by control box

Mixing –head motor

37kw

Total power

About 90kw

 

How is the packing of the machine?

 

The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.

 

How many container will be needed for the whole set of machine?

 

For the standard 13 groups of Automatic continous foam machine Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.

We will try the best way to pack all the machine well and also save the freight cost.

 

Our Services

 

1. We will help to design the layout of the machine that put in your factory.

2. We will send 2-4 experience engineers to install and testing the machines.

3. We will teach your engineer how to operate the machine and how to maintain the machines.

4. We will give you the machine operation manual and the best formulation for target products that you are going to make.

5. We will help to buy the best raw material for making the foam if you needed.

 

FAQ:

 

Q: How many days for the install and testing of the machine?

 

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

 

Q: For the cost of the engineer how much I need to pay?

 

A: You need to pay USD40 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

 

Q:What kind of raw material tools we need to prepare for the testing?

 

A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

 

Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

 

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.

 

Q:During the foaming if we have some problems abt the foam and the machine how can we do ?

 

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

 

Q: During the using of the products if we find some problem how can we slove?

 

A: You can just help to check in the operation manual and the video first if can’t work just call our after sale service.

 

Q: How many spare parts for you to give us?

 

A: We will send you all the necessary spare parts that free of charge together with the machine. After that you need to buy.

 

The main part of the machine

 

 

Hot Products

Full Automatic High Rebound Polyurethane Foam Production Line With PLC Digital Touch Screen Product ...
Fully-Automatic Horizontal Continuous Polyurethane Foam Injection Machine With American Vicking Pump ...
High Effeiciency MattressFoam Production Line Full Automatic 200~300L/min Horizontal Automatic ...
Polystyrene Horizontal Flexible Foam Production Line for Mattress and Pillow Specification The Foam ...
Full-Auto Batch Box Polyethylene Foam Production Line / Equipment 230kg / h Specification This ...
Horizontal Continuously Polyurethane Foam Production Line for Furniture and Pillow ZHMACH Horizontal ...