Home Companies Dongguan Zehui machinery equipment co., ltd

Automatic Pvc Foam Board Making Machine With US Viking Pumps

Dongguan Zehui machinery equipment co., ltd

Contact Us

[China] country

Trade Verify

Address: Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China

Contact name:Wang

Inquir Now

Dongguan Zehui machinery equipment co., ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Automatic Pvc Foam Board Making Machine With US Viking Pumps

Country/Region china
City & Province dongguan guangdong
InquireNow

Product Details

 

Automatic Foam Making Machine / Pvc Foam Production Machine With US. Viking Pumps

 

 

Product Description

 

[Specifications]

 

DimensionL35M×W4M×H3M
Foaming width980mm~2250mm
Foaming heightUnder 1200mm
Foaming density8kg/m3~100kg/m3
Foaming speed2000rpm~7000rpm

 

(1) The whole machine parts specifications:

 

1. Foaming control Platform(standard) L3m×W2.52m×H0.7m

2. Oven declining board (standard) L9m×W0.98m~2.30m

3. Oven side links(standard) L18m×W2.3m×H1.2m

4. Oven machine frame(standard) L18m ×W4m×H3m

5. Oven inner conveyer line (standard) L18m×W2.3m×H0.83m

6. Foam block cutter machine (standard) W2.3m×H1.30m(saw/knife with cross type )

 

(2) Main technique specification

 

1. Total length 33m× width 4m×height 3m

2. Foaming material Group: 13 groups, man-machine interface, automatically computer control

3. Foaming width 980mm~2250mm

4. Foaming height Max 1300mm

5. Foaming density 8Kg/m³~100Kg/m³

6. Foaming speed 2000r/min~7000r/min

7. Max total output 300KG/min

 

MotorGuangdong brand
PumpViking pump & Chinese pump
InvertorSiemens brand
PLCSiemens
TemperatureControl system

 

Remark:The above only for reference. All the data is subjected to sold products.

 

The frame of production line

 

The foam oven
 
Mixing head and material tanks
 
Packing & shiping
 

How is the packing of the machine?

 

The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.

 

How many container will be needed for the whole set of machine?

 

Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.

 

We will try the best way to pack all the machine well and also save the freight cost.

 

 

Our Services

 

We will help to design the layout of the machine that put in your factory.

We will send 2-4 experience engineers to install and testing the machines.

We will teach your engineer how to operate the machine and how to maintain the machines.

We will give you the machine operation manual and the best formulation for target products that you are going to make.

 

 

FAQ

 

Q: How many days for the install and testing of the machine?

 

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

 

Q: For the cost of the engineer how much I need to pay?

 

A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

 

Q:What kind of raw material tools we need to prepare for the testing?

 

A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

 

Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

 

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.

 

Q:During the foaming if we have some problems abt the foam and the machine how can we do?

 

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

 

You are warmly welcome come and visit our factory.

 

foam peeling machine and re-bond foaming machine l...

Hot Products

High Rebond And Memory Foam Making Production Line Five Formular Continuous Product Description The ...
Continuous Foam Production Line / Foam Manufacturing Equipment For Mattress ZHMACH Horizontal ...
8~100kg/m3 Density Sponge Continuous Foam Production Line For Mattress ZHMACH Horizontal Continuousl...
Zehui Automatic Long Polyurethane Foam Making Machine Line For Mattress ZHMACH Horizontal Continuous...
Zehui Automatic Long Polyurethane Foam Making Machine Line For Mattress The ZHMACH horizontal ...
8~100kg/m3 Density Sponge Continuous Foam Production Line For Mattress Description of Foam ...