Shenzhen Leyond Lighting Co.,Ltd. |
|
3 Year Warranty LED HighBay Light Competitive 120W LED Industrial
Lighting
• Unique and beautiful looking design.
• Good heat dissipation performance guarantee the long life span.
• PC Reflector and PC Lens.By the combination illumination in the
tridi-mensional space ,highlight the environment with the sense of
the space,and it is full of decorative.
• Waterproof design, eliminating mist, avoiding
condensation,improving quality,extending the life span.
• Reflector's beam angel 90 °,Reflective rate could reach up to 92%.
• Over Current, Over Voltage, Over Heat, Thunder Protection
• Choice of Correlated Color Temperatures (Specification Re-Defined
Accordingly)
• Long lifespan for LED 50,000 hrs
• 100% Recycle, No Pollution, and UV, IR
Par NO Parameter | LY-HB31080XX | LY-HB31100XX | LY-HB31120XX | LY-HB31150XX |
Inptut voltage | AC100~240V 50/60HZ | |||
Sysem consumption(W) | 80 | 100 | 120 | 150 |
Luminous flux(lm) | 8000 | 10000 | 12000 | 15000 |
Chip Brand | 3030 | 3030 | 3030 | 3030 |
Beam Angle | 90° | 90° | 90° | 90° |
CRI | >80 | |||
Color Temperature | Warm white:2700-3200K / Neutral white:4000-4500K / Pure white:5000-6500K | |||
LED Driver | / MEAN WELL | |||
Luminous efficiency(lm/w) | >100 | |||
Lifespan(hrs) | >50000 | |||
IP Rating | IP53 | |||
Dimmable | YES&NO | YES&NO | YES&NO | YES&NO |
Size(mm) | Φ325x400 | Φ345x400 | Φ445x400 | Φ445x400 |
Product Size:
Outlook:
FAQ:
1. How to choose LED light source?
A: Lumens(LM), light efficiency (LM/W), Life span (hrs) are very
important factors when choosing LED light source. The higher, the
better. Besides, brand of LED chip, LED base and other materials
will influence the product reliability.
2. Why choose Leyond Lighting?
A: Client-oriented, technology first, hornest operation is our
business philosophy. Leyong always treat the clients benefit as the
most important thing. So, we use the top brand material to produce
high quality product.
3. What can Leyond offer?
A: Our products covers a wide range. We can offer you, LED flood
light, LED high bay, LED downlight, LED ceilling light, LED spot
light, LED tube, LED module, LED Street Light, ect.
4. How to place an order?
A: Contact our sales representatives by email, skype or making a
call, we will soon send you confirm with you for your detailed
requirements. Then we send you PI for your approval and payment.
You can choose wire transfer, PayPal, west union to send us
payment.
5. How long will be the lead time?
A. This will be subject to your order quantity. Normally, below
5,000pcs, we will deliver within 15 working days. For large
quantity, please confirm with your order.
6. Can you accept OEM or ODM design?
A: Yes,OEM or ODM design is available
7.What is the delivery term?
A:EXW,FOB,CIF is available.