Home Companies Dellok Yonghui Radiating Pipe Manufacturing Co.,Ltd.

DELLOK 316 Stainless Steel G Finned Tube For Radiator

Dellok Yonghui Radiating Pipe Manufacturing Co.,Ltd.

Contact Us

[China] country

Trade Verify

Address: No.20 Xinghuo Road,Nanjing,Jiangsu,China

Contact name:Brian Wanqian

Inquir Now

Dellok Yonghui Radiating Pipe Manufacturing Co.,Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

DELLOK 316 Stainless Steel G Finned Tube For Radiator

Country/Region china
City & Province nanjing jiangsu
Categories Alloy
InquireNow

Product Details

DELLOK 316 Stainless Steel G Finned Tube For Radiator

 

 

About Us

 

Dellok(YONGHUI Radiating Pipe Manufacturing Co.,Ltd) was established in 2002, which is located in Nanjing, China.We joined HARBIN AIR CONDITIONING CO., LTD. in 2022 and became the most professional industry manufacturer in China. After many years of development, the company now has 66 million yuan in fixed assets, more than 200 employees, and 33 technical staffs. We have 4 aluminum processing production lines, with the annual processing capacity of more than 20,000 tons; And we have 5 tube-drawing production lines; 47 fintube production lines, 1 imported production line from American with the brand of McElroy , with the annual production capacity of 12 million meters the above.

Quality is the theme of eternal pursuit of winner

 


                              

 

Product Description

 

 

The Imbedded Fin, also known as a G-fin (grooved fin), is widely used throughout the world. This fin is considered to have a mechanical bond to the tube and has negligible deterioration of the fin bond with heat cycling. The fin is usually specified for high temperature applications with the fin material being the limiting factor. Typically, this fin is produced out of aluminum or copper fin strip. This fin type is also suitable for carbon steel or stainless steel fin materials, but requires special tooling and processing of these steel fin strips.

Preforming is not required for aluminum fin on carbon steel tubes, but is required for copper or steel fin and in the case of aluminum fin on aluminum tubes. Dovetail rollers are used to preform the fin and facilitates insertion into the groove. When standard groove depth is used for aluminum or copper fin strip, the fin strip width is always .012” larger than the fin height, i.e. .625” plus .012” = .637”.

 

 


 

 

G Finned Tube Manufacturing Process:

 

 

The manufacturing tool is made up of 2 non-cutting plates set at 90° to the axis of the base tubes (pipes) (core tube).The first plate effects a groove for metal spinning. The second directs the ribbon in the groove and sets the fin foot in the groove through pressure on the metal displaced for the groove. A similar plate made of tungsten carburate allows us to manufacture. G embedded fin tubes ( fin tubes )with base tubes (pipes) (core tube) made of austenitic steel or exotic alloys.

 

 

 

 

G Finned Tube Advantages:

 

 

High fin stability, excellent heat transfer, high operating temperature.

The fin/tube wall contact is constant because of the setting and makes it possible to use a wall temperature of up to 450°C.

The fin is set throughout its length and consequently does not unwind even when partially uprooted.

This kind of finned tube is one of optimum choices for having good effectiveness/cost ratio.

 

 

 

 

 

G Finned Tube Specifications

 

 

Product Specification
Tube OD19~51 (mm)3/8”~2”
Tube Wall Thk2.11~3.5(mm)0.083”~0.138”
Tube Length≤18,500 (mm)≤60.7 ft
Fin Thk0.3~0.5 (mm)0.012”~0.02”
Fin Height10~16 (mm)0.394”~0.63”
Fin Pitch100~433 FPM3~11 FPI
Fin TypeG
Material Combinations
Fin MaterialAluminum (most common grade:Alu.1100, Alu.1060, Alu. 6063)
Copper
Tube MaterialC.S. (most common grade: A179, A192,SA210 GrA1/C,A106 Gr B )
S.S. (most common grade: TP304, 316)
Copper (most common grade:UNS12200,14200, 70600, CuNi70/30, CuNi 90/10)
Titanium (most common grade: B338Gr2)
Applied400°C
Temperature
Type of Service

High temperature

 

 

 

 

FAQ

 

 

Q1: Are you trading company or manufacturer?

A: We are manufacture factory and we can accept OEM order. Welcome to visit our factory and check our products.

 

Q2: Can I have a sample ?

A: Yes, welcome to place sample order to test and check quality. Mixed samples are also OK.

 

Q3: What is your the lead time for production?

A: Generally Sample needs 1-3 days, mass production needs 15-30 days, also depends on your request.

 

Q4: What is the warranty for your products?

A :We provide one year warranty for the products.

 

Q5: What payment terms do you accept?

A :Trade assurance,TT,Western Union.

 

 

Hot Products

DELLOK Corrosion Resistance Aluminum Fin Tube for Heat Exchangers 12-24 Fins Tube Support Accessorie...
DELLOK Corrosion Resistance Heat Exchanger Tube Sheet with Customizable Length About us Dellok ...
DELLOK Heat Exchanger Tube Sheet with Custom Accessories Various Acceptance Criteria About us Our ...
DELLOK Tube Support Accessories for Corrosion Resistance Heat Exchanger Tubes About us Our company ...
DELLOK Customizable Heat Exchanger Fins with Corrosion Resistance 90° and 180° Elbow Accessories ...
DELLOK Corrosion Resistance Aluminum Fin Tube Customizable Length Tube Wall No Limit Product ...