Shenzhen HYPET Co., Ltd. |
Verified Suppliers
|
|
HDPE Pipe Extrusion Machine / Single Screw Extruder Machine Manufacturer SJ 75/33
HDPE Pipe Extrusion Machine HYPET Special features except the same features with other supplier.
HDPE Pipe Extrusion Machine Configuration list
Note: This table as attached file which is for selection of the configuration on the extruder.
SN | Items | Choosing configuration | Other option |
1 | Production control system | PLC control system | Digital system available |
2 | Cooling system of the main control electric cabinet | Fan cooling for option | Air conditioner cooling cabinet |
3 | Main motor | AC motor with famous inverter | DC is for option |
4 | Pressure sensor | HYPET individual temperature and pressure control in two parts | Dynisco is for option |
5 | Material of screw & barrel type | Nitro Alloy with bi-metal in two layers | Standard Nitro with Alloy plating option |
6 | Hot Dryer | Hot Dryer HY-HD75 | Standard empty hopper |
7 | Auto Loader | Vacuum dryer loader HY-AL300ST | No Loader |
HDPE Pipe Extrusion Machine Main specification:
SN | Parts name | Specification | Description |
1 | Extruder | Extruder model | HYSJ-75/33 single screw extruder for PPR |
Output | 250 kg/h | ||
2 | Electrical Control system | Detachable control panel | Siemens PLC |
Components brand | Siemens, RKC, ABB, etc. | ||
3 | Screw | Diameter | Ø75mm |
Screw ID ratio | 33:1 | ||
Finish | Nitrogen-filled (0.50~0.70mm depth) and polish | ||
Max rotate speed | 107 r/min | ||
Core of the screw | Auto control for temperature |
4 | Barrel | Inside finish | Nitrogen-filled (0.50~0.70mm depth) |
Heating control area | 5 areas | ||
Heating way | Copper cooling fins with ceramic heater | ||
Heating power | 20 kW | ||
Cooling system | Low-noisy barrel cooling fan | ||
Cooling power | 0.25kW x 5 sets |
6 | Driving motor | AC motor power | 90 kW |
AC inverter controller | Siemens brand |
HDPE Pipe Extrusion Machine Photo
HDPE Pipe Extrusion Machine Guarantee clause
1) Guarantee is 1 year (excluding human factor and wearing parts).
2) Under proper working conditions, 12 months from the date of completion of commissioning at the buyer's site, and should be at the latest within 14 months from the issuing date of Bill of Lading.