Home Companies GZ Yuexiang Engineering Machinery Co., Ltd.

High Efficiency HD800-7 Travel Gearbox Hub For KATO Excavator Assembly

GZ Yuexiang Engineering Machinery Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: 429-432, No. 268 Zhongshan Avenue East, Huangpu District, Guangzhou,China

Contact name:Dongdong Yao

Inquir Now

GZ Yuexiang Engineering Machinery Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

High Efficiency HD800-7 Travel Gearbox Hub For KATO Excavator Assembly

Country/Region china
City & Province guangzhou guangdong
Categories Shafts
InquireNow

Product Details

                                               HD800-7 Travel Reduction Gear Hub HD800-7 Travel Gearbox Hub For KATO Excavator
 
Supply Ability
 
Supply Ability:      500 Piece/Pieces per Month
 
Packaging & Delivery
 
Packaging Details: Wooden boxes
 
Port:                       Huangpu
 
HD800-7 Travel Gearbox Hub For KATO Excavator Description

 

PART NAMEKato HD800-7 Travel Gear Reduction
EQUIPMENTapply to Kato HD800-7 EXCAVATOR
PART No.----
SERIAL No.----
FRAME HOLES30
SPROCKET HOLES30
EGORYConstruction Machinery Parts, Excavator Spare Parts
INSTALLATIONPOWER TRAIN
APPLIIONReplacement
ITEM CONDITIONNEW
LOGOBN
MOQ1 pc

 

ADDITIONAL DESCRIPTION of HD800-7 Travel Gearbox Hub:

1. Completely, assembly, and ready to installed in your Kato HD800-7 excavators.

2. Without MOTOR, already been installed the MOTOR SHAFT & MOTOR HOUSING.

3. All components are produced by us.

4. All new, undamaged.

5. Painted or Unpainted, depend on requirement

6. 90 days warranty, call or email with any questions.

7. Plywood Packing, free of fumigation

8. Deliver to worldwide by Sea, Air, or Carrier.

 
KATO Excavator HD800-7 Travel Gearbox Hub Picture
 
 
 
Our Services
 
1.The parts will give weight,price when quotation.
2. Genuine parts stock pictures will send before order.
3. All parts can check with part number,all parts can order follow part number.
4. Safe packing to protect the goods, such as wooden box, Iron sheet for our parts.
5. Small quantity can accept,Sample order also accept.

 

WHY US:

  1. We are the manufacturer and own 18000 m2 factory areas, good relationship with material suppliers, which make more competitive price and steady quality.
  2. We have more than 80 units advanced facilities for production.
  3. We have 8 senior engineers with more than 30 years experience on designing and machining.
  4. Our sales term offer the efficient service for every customers.
  5. We are the long term parts supplier for many famous companies, such as FOSTER WHEELER POWER MACHINERY CO.,LTD and C.R.Dinly etc.
  6. We develop spare parts for old and new excavator models, and submit our latest products to customers every month so that to meet the market demand.
  7. We have high market share in Oversea market and Domestic market, Southeast Asia 60%, Russia 10%, Middle East 8%, North and South America 10%,Europe 8%, others 4%.


FAQ
 

Q: When will ship my order?
A:Once we get confirmation of payment, we will try our best to ship order within 24 hours.
Q: Which shipping term you can supply?
A:By sea, air or by express ( DHL, Fedex, TNT, UPS, EMS)
Q: How long does it take to my address?
A:The Normal delivery time is 4-7 days, depending on which country you are in.

Hot Products

Kawasaki Original Parts K7V63DTP1X9R-0E23-1BV SK135SR SK135-8 Hydraulic Pump Description Of ...
NACHI Excavator Hydraulic Pump PVD-1B-32P Original Mini Piston Pump PC20 PC30 VIO35 Part name Piston ...
Doosan Excavator Heavy Equipment Pump DX340 A8VO200 Hydraulic Pump Unit The main pump of KAWASAKI ...
NACHI Original 1.5 Tons Excavator Hydraulic Pump PVD-0B-18P PC15 Piston Pump Details of PVD-0B-18P ...
Original Pump Large Hydraulic Cylinder A11VO95 Rexroth Hydraulic Pump A11VO95 Rexroth Hydraulic Pump ...
Nachi Original Excavator Hydraulic Pump PVD-2B-50 Main ZX60-5 SK60 E305 Piston Pump PVD-2B-50 piston ...