Guangzhou Hongsheng Machinery Parts Co., Ltd. |
|
Product Keywords: 6222-81-8210 6222-83-8171 Komatsu PC300-5 300-6 Turbocharger S6D108 Engine
pplication | Crawler Excavator |
MOQ | 1 Piece |
Condition | 100%new |
Certification | ISO9001 |
type | Engine parts |
Product | Komatsu PC300-5 PC300-6 engine turbocharger |
Engine | S6D108 |
Part Number | 6222-81-8210/6222-83-8171 |
delivery time | In stock 1-3 days Out of stock 3-7 days |
Komatsu supercharger series | ||
Turbocharger Applicable Models | Engine model | Part Number |
PC200-3/TO4B53 | S6D105 | 6137-82-8200 465044-0261 |
PC200-5/TO4B59 | S6D95 | 6207-81-8201 |
PC200-6/TA3137 | S6D95 | 6207-81-8331 |
PC220-6/HX35 | S6D102 | 6735-81-8031 3539697 3539698 |
PC200-7/HX35 | SAA6D102E-2 | 4038475 |
PC200-8 | SAA6D102E-2 | 4038469 6754-81-8090 |
PC200-8EO/HE221W | 4D107EPIC QSB4 | 6751-81-8080 4048808 4048809 |
PC220-7/PC210-7 | SAA6D102E-2 | 6738-81-8181 6738-81-8190 3598036 4035899 4038471 4035375 4035376 |
PC220-8/240-8 | SAA6D107E-1 | 6754-81-8190 |
PC300-5/300-6 | S6D108 | 6222-81-8210 6222-83-8171 |
PC300-7/360-7 | SAA6D1114 | 6743-81-8040 4038421 3597311 3597312 |
PC400-5/PC400-6 | S6D125 | 6152-81-8500
|
PC400-7/PC450-7 | S6D125E-3 | 6156-81-8170 |
PC400-8/450-8 | S6D125E | 6506-21-5020 |
The exhaust gas turbocharger uses the high-temperature exhaust gas
of 700-900 degrees Celsius from the engine to drive the turbine in
the turbine to rotate. The turbine shaft drives the impeller in the
compressor to rotate at a high speed, compresses the air in a
centrifugal way, and provides the intake density of the engine to
2-3 atmospheres. In this way, we can inject more fuel into the
engine to achieve the purpose of increasing the power of the engine
itself.
Q1: How is the quality? How long is the warranty? Are there any
deviations in part size?
A: High quality guarantee, 3-6 months warranty, please rest assured
that there is no deviation in the size of the parts
Q2: Can I order 1 piece for trial quality and ordering process?
Answer: Yes
Q3: Delivery time?
A: Spot delivery time is 1-3 days, out of stock delivery time is
3-7 days
Q4: What should I do if your website doesn't have what I want?
A: You can send the part number of the accessories you need or send
a picture through the contact form at the bottom and we will
provide you with a quote
Order process: From your order to delivery, we will follow up the
logistics information until you receive the goods, you can rest
assured to cooperate with us
Note: We are professional parts manufacturer.
Each of our parts will be tested more than 10 times from the
factory to the time of sale. After checking whether the parts are
normal, they are provided to customers to ensure that we provide
you with the best quality and most assured products.