ZHEJIANG YOMIN ELECTRIC CO.,LTD |
|
Features :
Tool (Plier) | YM-FP01 | For floor |
YM-WP01 | For wall |
How to Use the Tile Leveling System
1. Spread your adhesive.
2. Insert clip underneath the tiles along the 4 sides. (Larger
tiles may require 2 clips per side.)
3. Set your tile and beat with a rubber mallet.
4. Insert wedge into slot at base of clip. Adjustable pliers are
recommended.
5. When adhesive sets, separate protrusion using rubber mallet or
feet. Beat parallel to the joint.
6. Sweep surface and save reusable wedges.
Quantity(Bags) | 1 - 1000 | 1001 - 5000 | 5001 - 10000 | >10000 |
Est. Time(days) | 3 | 7 | 10 | To be negotiated |