Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

350 Meters Borehole Depth Hard Stone Blasting For Deep Water Well Drilling

Jinzhou City Shitan Machinery Equipment  CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village,Jinzhou City,Hebei province,China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

350 Meters Borehole Depth Hard Stone Blasting For Deep Water Well Drilling

Country/Region china
City & Province jinzhou hebei
InquireNow

Product Details

350 Meters Borehole Depth Hard Stone Blasting For Deep Water Well Drilling

 

 

ST 350 Borehole Drilling Rig Description

 

St 350 borehole drilling rig power system is hydraulically driven by diesel engine. The dashboard is simple and clear. It is a crawler mounted structure, which is easy to move. Steel crawler chassis is adopted (of course, you can also choose rubber crawler to facilitate walking on urban roads). Four standard high legs .

 

ST 350 Borehole Drilling Rig Tech Data:

 

Drilling Rig NameST 350 Drilling Rig
Drilling depth350m
Dia.hole φ140-325mm
Advance Length one time6.6m
Working pressure1.7-3.0MPa
Air consumption17-35m³/min
Length of rod1.5m,2m,3m,6m
Dia. Of rodφ76, φ89,φ102,φ114
Lifting power24T
Rotation torque8500-11000N.m
Rotation Speed40-70r/min
Diesel EngineYuchai
Engine Power92Kw/2200rpm
Travelling speed0-2.5 Km/h
Climb capacity30°
Weight9500kgs
Dimension6000x2200x2900mm
ApplicationComplicated geological conditions:Rock,Mud,Sand etc.
Drilling WayTop drive hydraulic rotary and propulsion,Dth Drilling or Mud Pump Driling
Dth Hammer4",5",6",8",10" Drill hammer or CIR110, 130, 150,170

 

ST 350 Borehole Drilling Rig Advantages:

 

1.YUCHAI engine;
2. Walking Type: crawler mounted ,trailer mounted for choice.
3. Hydraulic oil pump:Parallel gearbox design separates the oil pump unit, the power supply is adequately distributed, the hydraulic system is uniquely designed, and the maintenance cost is small;
4.Rotary head device:gearbox integrated casting, dual motor power, large torque, durable, low maintenance costs;
5.Drilling machine chassis:professional digging chassis, durable, heavy bearing, wide chain plate, less damage to hard roads;
6.Lifting force:design composite tower, 3.4m long stroke, double cylinder lift capacity 18 ton.
7. Each rig is equipped with a relief valve to raise the boom to protect the cylinder and ensure work safety;
8. Each hydraulic oil pipe is covered with a protective jacket to make the oil pipe last longer.

 

ST 350 Borehole Drilling Rig Drilling Process 

 

After the well is completed, measure the water level of the water outlet well and the corresponding water output according to the drainage condition of the drilling machine, and then determine the total head of the water pump according to the height difference from the ground to the dynamic water level and the irrigation method you adopt, and the required working head of the water pump. The flow of the water pump shall not exceed the water flow through the well. The corresponding water pump shall be purchased on the premise of the above two items.

 

What should be paid attention to when using DTH bit?

 

1. According to the rock conditions (hardness, corrosion) and drill type (high wind pressure, low wind pressure) to choose the drill bit.

Different forms of alloy and cloth teeth are suitable for drilling different rocks.

Choosing the right drill bit is the premise to get the best use effect;

2. When installing the drill bit, gently insert the bit into the drill bit bit sleeve of the drill bit impactor. Do not force collision to avoid damaging the drill bit

In the process of rock drilling, it is necessary to ensure that the pressure of air on the drilling rig is sufficient;

3.In case of intermittent work , the compressed air system of the drilling machine should be checked to ensure that there is no rock slag in the hole during the drilling process;

4. If a metal object is found falling into the hole, it should be pulled out with magnet or other methods in time to avoid damaging the bit;

5.Pay attention to the size of the hole drilled when replacing the drill bit.

If the bit diameter is too worn out but the hole has not been drilled, do not update the bit to avoid sticking.

The operation can be completed with old drill bits that have been used and worn out to approximately the same diameter

 

 

 

 

 

Hot Products

Water Well Borehole Machine Agricultural Irrigation ST 260 Drilling Rig ST 260 Borehole Drilling ...
Farming Personal Use ST 50 Water Well Drilling Rig Machines Portable Equipment 50 Meters Water Well ...
300 Meters Deep Underground Wheels Mounted Water Well Drilling Rig Machine​ GY 200 Water Well ...
XY-1 Water Well Drilling Rig Machine Exploration Engineering Equipment XY -1 Water Well Drilling Rig ...
400 Meters Deep Underground Hole Blasting Water Well Drilling Rig Machine For Business ST 400 Water ...
350 meters Drilling Depth Borehole Blasting Equipment For Industry Water Well Drilling ST 350 Water ...