Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

St 50 Portable Hydraulic Water Well Drilling Rig Equipment

Jinzhou City Shitan Machinery Equipment  CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village,Jinzhou City,Hebei province,China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

St 50 Portable Hydraulic Water Well Drilling Rig Equipment

Country/Region china
City & Province jinzhou hebei
InquireNow

Product Details

Shitan Machinery ST 50 Portable Hydraulic Drilling Rig Equipment Borehole Drilling Machine

 

 

ST 50 Borehole Drilling Machine Information:

 

This is for drilling wells, general exploration, geophysical prospecting, road and construction exploration, and blasting holes.According to the different layers of the bottom selection of alloys, diamonds and composite drill bits for drilling.mine drilling rig 50m drilling

 

ST 50 Borehole Drilling Machine Technical Data:

 

Drilling Rig  Max. drilling depth50m
Max .opening diameterφ75-φ108mm
End hole diameter56-75mm
Active drill pipe50/1000mm
Drill pipe diameterΦ42mm
Drill pipe length1000mm
Power (diesel engine)5.8kw(8P)/2200r/min
Size1400*600*1600mm
Weight240kg
Spindle
Speed285-570r/min
Torque600 N*m
Stroke1000mm
Lifting force300KG
Pressure200KG
Drilling Tower (optional)
Rated load1t
Height4m
Tower leg specifications60mm
Mud Pump
ModelBW-50
Flow50L/min
Max.pressure1.2Mpa
Times63/min
Inlet hose diameterφ55mm*2.5m
Outlet hose diameterΦ20mm*10m

 

ST 50 Borehole Drilling Machine Features:

 

1. Equipped with double oil cylinder hydraulic feeding system, the drilling speed is fast and the work efficiency is high.
2. The drilling rig is equipped with a fixed clamping mechanism and an integrated main rod, which does not need a drill tower and works conveniently.
3. Equipped with 4-speed transmission system. The operator can freely adjust the forward rotation speed through three gears, and is also equipped with a slow reverse gear to facilitate the operator to disassemble the drill pipe and drill tool.
4. The handle is centralized, easy to operate, safe and feasible.
5. It is equipped with a hole bottom pressure gauge to indicate the pressure, which is convenient to master the situation in the hole
6. Compact structure and small floor area.
7. It has strong decomposition ability and is easy to move. It is suitable for working in hilly, mountainous and other complex terrain

 

ST 50 Borehole Drilling Machine  Operation Attentions:

 

1) The drill can be started only after the power machine operates normally. The clutch shall be engaged smoothly without impact. It must be light, uniform and stable.
(2) When pulling the transmission or transfer case handle to change speed, the clutch must be disengaged first. It is strictly prohibited to start the transmission. The gear can be shifted only after the gear speed slows down to avoid damaging the gear.
(3) Each shift gear shall be fully engaged to avoid damage to the gear by automatic sliding.
(4) During operation, pay attention to check the operating parts, such as bearing, gearbox, etc. the temperature shall not exceed 60 ℃. If it is overheated, stop the machine for inspection.
(5) In case of clutch heating or slipping, stop the machine for inspection and adjust the clearance of clutch friction plate. The clearance adjustment shall be appropriate. If it is too tight, the clutch will not engage; If it is too loose, the clutch will work in the semi clutch state, which will reduce the transmission torque and rapidly wear the friction plate.
(6) Before starting the drilling rig for drilling, the drilling tool shall be lifted away from the hole bottom, and then the clutch shall be closed. After the drilling rig operates normally, the pressure shall be applied for drilling.
(7) When using the elevator, it is forbidden to press down the left and right handlebars at the same time, or tighten the handlebars combined with the foot brake at the same time; The winch shall not be overloaded.
(8) Before starting drilling for a new drill or a drill with a long shutdown time, the drill shall run at 2 speeds for at least 20 min. normal drilling can be carried out only after lubricating oil is splashed on each gear and bearing.
 

 

 

 

 

Hot Products

260m Hydraulic Crawler Type Borehole Water Well Drilling Machine Rig Mine Drilling Rig ST 260 Meters ...
300 Crawler Pneumatic Drilling Machine Impact Large Diameter Deep Water Well Drilling Rig ST 300 ...
Crawler Mounted DTH Drilling Rig 200m Diesel Engine Water Well Drilling Rig Borehole Machinery ...
ST 300 Customized Large Water Well Drilling Rig Machine ST 300 Water Well Drilling Rig Machine ...
ST 180 Rubber Crawler Mounted Large Water Well Drilling Rig Machine ST 180 Water Well Drilling Rig ...
ST 450 High Speed Water Well Drilling Equipment ,OEM Crawler Mounted Drilling Rig Machine ST 450 ...