Home Companies Bestaro Machinery Co.,Ltd

16 / 5T Double Girder Overhead Cranes For Industrial And Mining Enterprises

Bestaro Machinery Co.,Ltd

Contact Us

[China] country

Trade Verify

Address: No.1,Wei'er Road, Changyuan Crane Industrial Park, Xinxiang City, Henan Province.China

Contact name:Tina Tan

Inquir Now

Bestaro Machinery Co.,Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

16 / 5T Double Girder Overhead Cranes For Industrial And Mining Enterprises

Country/Region china
City & Province xinxiang henan
InquireNow

Product Details

16 / 5T Double Girder Overhead Cranes For Industrial And Mining Enterprises

 

Introduction:

 

Double beam bridge crane is also known as double beam crane and crown block. Its bridge runs longitudinally along the track laid on the viaducts on both sides, and the lifting trolley runs transversely along the track laid on the bridge, forming a rectangular working range, which can make full use of the space under the bridge to lift materials without being hindered by ground equipment.

 

Technical Parameter:

 

Technical Specifications
Lifting CapacitySpanLiftingWork DutyMain LiftingVice LiftingTrolley TravelingCrane TravelingTrack
HeightSpeedSpeedSpeedSpeed
     
tmm m/minm/minm/minm/min 
513.5~19.518A50.84~8.4 3.4~345.1~5138kg
22.5~31.55~50
513.5~19.518A50.78~7.8 3~305~5038kg
22.5~31.55.2~52
16/513.5~19.518/18A50.76~7.60.84~8.43.5~355.1~5143kg
22.5~31.55.2~52
20/513.5~19.518/18A50.6~60.84~8.43.5~355.1~5143kg
22.5~31.55.2~52
32/513.5~19.518/18A50.52~5.20.84~8.43.1~315.1~5143kg
22.5~31.55.2~52
Oct-5013.5~19.518/18A50.43~3.90.78~7.83.6~364.8~4843kg
22.5~31.55.4~54
Notes: Customizable

 

Component:

 

Bridge cranes are generally composed of mechanical, electrical and metal structures. The external appearance of the bridge crane is a single span flat plate bridge with two ends supported on two parallel overhead rails.

Mechanical part: it is divided into three mechanisms, namely lifting mechanism, trolley running mechanism and cart running mechanism. The lifting mechanism is used to vertically lift articles, and the trolley running mechanism is used to carry the load for lateral movement; The crane running mechanism is used to move the lifting trolley and articles longitudinally to achieve three-dimensional space for handling and loading and unloading goods.

Metal structure: composed of bridge and trolley frame.

Electrical part: consists of electrical equipment and electrical circuits.

 

 

Application:

 

Double girder overhead crane is an important tool and equipment to realize mechanization and automation of production process in modern industrial production and lifting and transportation. Therefore, double-girder overhead cranes are widely used in indoor and outdoor industrial and mining enterprises, iron and steel chemical industry, railway transportation, port terminals and logistics turnover departments and places.

 

 

 

 

Hot Products

Frequency Control And Braking European Standard Single Girder Overhead Cranes Easy To Use Introducti...
High transmission Efficiency Single Girder overhead Crane 15 ton span 1-15m high safety and saving ...
Workshop1-10ton single girder EOT overhead crane European standard OEM electric travelling crane ...
Heavy Duty Construction Lift A3-A8 1-20t Capacity *, *::before, *::after {box-sizing: border-box; } ...
High Speed 20-30m/min Construction Lift Crane with Cabin/Remote Control & Customized Color *, *:...
Single Girder Overhead Crane 380V/50Hz/3Ph Traveling Speed 20-30m/min for Heavy Duty Material ...