DONJOY TECHNOLOGY CO., LTD |
Verified Suppliers
|
|
SS316L Pneumatic Mixing Proof butterfly valve with feedback unit F
top ( Limit switch )
Specification
Product Name: | SS316L Pneumatic Mixing Proof butterfly valve with F top( Limit switch ) |
Valve Body Material: | 316L |
Seal Material: | EPDM (standard) FPM/SILICON/NBR, FDA177.2600 |
MaxWorking Pressure: | 10Bar |
Max.Working Temperature: | 120 degree C |
Available size: | 2"-4" |
Available connection: | Clamp/welding/thread/special connection |
Available standard: | 3A/DIN/SMS/RJT/ISO/IDF |
Operated: | Manual,Pneumatic, Electric |
Handle application: | Two-position handle, three-position handle, four-position |
Control: | Smart valve positioner / C-TOP control / position sensor |
Certificate: | 3A/54-02 (1580), PED/97/23/EC, FDA.177.2600, ISO |
Application scope: | Dairy,food, beverage, pharmacy, cosmetic, etc |
Surface finishing: | Ra≤0.8μm |
Artwork: | Forging |
Application :
The mixproof butterfly valve as a process element for the
separation of media is suitable for a variety of applications:
1. In CIP systems, for separating CIP media
2. In flush-out processes
3.In water management
4. As pipe section shut-off valve for separating media
5. In CIP/Gas management (breweries)
6. At storage tanks for separating products(CIP)
7.As CIP return valve in a valve matrix
8. Preferably suitable for liquid and gaseous media without
suspended matters/particles
Operating Principle
1.Double seat mixproof butterfly valve (Type A) Valve closed
Position When the valve is in the non-actuated position(off
position), medium A and medium B are reliably separated. The
leakage cavity open towards the atmosphere in this case. After
switching, the medium in the valve disk leakage areas can drain by
gravity(1), The connection is also served as a leakage indicator.
Valve open Position
When the valve open, the leakage paths towards the atmosphere are
closed. Cleaning of the leakage cavity The leakage paths can be
cleaned/flushed if necessary. For this purpose, the two cleaning
connections can be integrated in to the CIP circuit. It can be
flushed when the valve is closed. The cleaning pressure in the
supply line should be slightly lower than the inside process
pressure( hygienic aspects)
FAQ
Q: How long have you worked in this field?
A: Over 15 years.
Q: What's the delivery time?
A: Standard products will be 10-15 days after receiving your down
payment or full payment.
Q: Can your factory produce products according to our drawings or
samples?
A: Yes, of course, we can.
Q: Are you a manufacturer or trading company?
A: We are a professional manufacturer.
Q: What is your factory's biggest advantage?
A: Technology is our core competitiveness.