Henan Perfect Handling Equipment Co., Ltd. |
|
industrial electric Rail Transport Equipment with DC Powered
Model | BDGS-2t | BDGS-20t | BDGS-50t | BDGS-100t | BDGS-150t | |
Rated Load(t) | 2 | 20 | 50 | 100 | 150 | |
Table Size(mm) | Length(L) | 2000 | 4000 | 5500 | 6500 | 10000 |
Width(W) | 1500 | 2200 | 2500 | 2800 | 3000 | |
Heigth(H) | 450 | 550 | 650 | 850 | 1200 | |
Wheel Base(mm) | 1200 | 2800 | 4200 | 4900 | 7000 | |
Rail Inner Gauge(mm) | 1200 | 1435 | 1435 | 2000 | 2000 | |
Wheel Diameter(mm) | 270 | 350 | 500 | 600 | 600 | |
Wheel Quantity | 4 | 4 | 4 | 4 | 8 | |
Ground Clearance(mm) | 50 | 50 | 50 | 75 | 75 | |
Running Speed(min) | 0-25 | 0-20 | 0-20 | 0-20 | 0-18 | |
Motor Power(kw) | 0.8 | 2.5 | 5.5 | 11 | 15 | |
Transformer Power(KVA) | 3 | 6.8 | 10 | 30 | 30 | |
Transformer Quanity | 1 | 1 | 1 | 1 | 1 | |
Running Distance(m) | 70 | 70 | 50 | 50 | 50 | |
Max Wheel Load(KN) | 14.4 | 77.7 | 174 | 343.8 | 265.2 | |
Reference Weight(t) | 2.8 | 5.9 | 8 | 14.6 | 26.8 | |
Recommended Rail Model | P15 | P24 | P43 | QU100 | QU100 |
Product process
CNC Cutting
The steel plate is transported from warehouse to CNC cutting workshop for cutting.
Preliminary Assembling
Workers put the cut steel plate together according to the design drawing.
Welding
Weld the steel plate with automatic welding machine after the
preliminary assembling.
Post weld treatmen
Test the welding section after the welding, polish and burring.
Post weld treatment to eliminate welding stress.
Spray Primer
Transport the structure part after processing to painting booth for
spraying primer. The main component of the primer is zinc rich
epoxy antirust paint.
Assembling
Assemble the structure parts after spraying primer with wheels,
motors and gear box, etc.
Paint finish
Transport the assembled cart to painting booth, inspect the
integrity of primer. After that paint the finish.
Debugging
Debugging the cart after painting the finish with electric control
system, after the debugging, the cart will be tested without load and then with load. After the inspection, the cart will be transported to
storage area.