Home Companies Guangzhou TP Cloud Power Construction Machinery Co., Ltd.

65.02501-0416 Diesel Engine Parts

Guangzhou TP Cloud Power Construction Machinery Co., Ltd.
Active Member

Contact Us

[China] country

Address: Zhuji International Machinery Parts City, No. 36 Zhuji Road, Tianhe District, Guangzhou City, Guangdong Province

Contact name:Kervin

Inquir Now

Guangzhou TP Cloud Power Construction Machinery Co., Ltd.

65.02501-0416 Diesel Engine Parts

Country/Region china
City & Province guangzhou guangdong
InquireNow

Product Details

DB58-7(0416) 65.02501-0416 DOOSAN DH-220-5 Piston Liner Kit

 

PLACE OF ORIGINNEGOTIABLEWARRANTY18 Months
MARKET TYPE2022DELIVERY TIME

Within one week after

receiving the payment

MOQ1 PCPATMENT TERMST/T, X-Transfer,L/C
QUALITYOUTSTANDING QUALITYPACKING

Wooden case/Carton/

Standard Shipping Package

 

BRAND


EXCAVATOR MODEL NUMBER

 

ENGINE MODEL NUMBERPISTON NUMBERPART NUMBERCYLS
DOOSANDH-220-5DB58-7(0416)041665.02501-04166

 

 

 

 

What are the serious consequences of not changing the oil on time?

 

1. Failure to change the oil on time will also bring about the problem of excessive sludge. Sludge is generally due to the high pressure unburned gas, acid, moisture, sulfur and nitrogen oxides in the combustion chamber entering the oil in the crankcase through the gap between the piston ring and the cylinder wall, and then mixed with the metal powder produced by the wear of the parts. Together, it accumulates slowly, and then sludge is formed.

Failure to change the oil on time will lead to an increase in sludge, and the increase in sludge will lead to blockage of filters and oil holes, which will make engine lubrication difficult and aggravate engine wear.


2. If the oil is not changed on time, the most serious consequence is the wear and tear of various mechanical parts of the engine, such as pistons and cylinders. Once there is a problem with the piston and cylinder, then the machine needs an overhaul, and overhaul is something every machine owner doesn't want to see.

Lack of oil, too much sludge in the oil, and decreased performance of the oil can lead to serious wear of the cylinder barrel and piston. If the oil is not changed in time, the above problems will basically appear, so it is very necessary to change the oil on time.

 

3. Failure to change the oil on time will cause the water temperature to be high. As mentioned above, if the oil is not replaced on time, the oil storage will be too small, resulting in no oil or less oil in the lubrication system. At this time, the various mechanical parts of the engine will be in a state of semi-dry friction or dry friction.

The semi-dry friction or dry friction state generates a lot of heat, which causes the water temperature to rise sharply.

If the water temperature is too high, the cylinder head and cylinder block will be deformed or even damaged. If such a fault occurs, the machine will not be far from the overhaul.

 

 

COMPANY PROFILE:

 

Guangzhou TP Cloud Power International Construction Machinery Co., Ltd,in【Starting with the apex technology of power machinery,challenge infinte possibility,providing superior technology and high value products to the world,committed to creating a cleaner and more comfortable earth society】,through research&development, production, sales of excavator engine parts, achieved sustainable development.

 

Our main products include various powder metallurgy parts such as piston rings, cylinder liners and powertrains for excavator engines,we through using lead step technology development for the overwhelming majority of customers with low cost has the original value of the products,in order to realize the engine such as lightweight,low fuel fee【environmentally friendly engine manufacturing】has made a contribution.We pursuit the highest quality,by the world's first-class speed,manufacturing world-class products efficiently.

 

 

 

 

 

 

OUR ADVANTAGES:

 

·Original Factory Guarantee

 

·Higher Efficiency

 

·Lower Fuel Consumption

 

·Longer Life

 

·Genuine Parts

 

·OEM Replaceable Parts

 

·4000Hrs Warranty

 

·Compact Design

 

·Providing Optimum Dynamicity Of High Stability

 

·High-Precision Motivation Adjustment

 

·Easy Replacement In Customer System

 

·The Highest Level Of Durability In Extreme Conditions

 

·Reduce Wear And Prolong Life

 

·Longer Service Life

 

·Better - Resistant And Heat - Resistant

 

·High - Precision And High Stability

 

·OEM

 

·Professional Technical Team

 

·A Full Range Of One - Stop Resources

 

·The Most Trustworthy Quality

 

 

FACTORY STRENGTH:

 

 

 

EXHIBITION
 

 


 

PACKAGE&SHIPMENT

 

 

 

FAQ:

 

1. Are you manufacturer or trading company?

 

We are the OEM manufacturer, head Office is in HongKong China.

 

2. What products do you make?

 

We are engaged in manufacturing engine cylinder liner, piston, piston ring, cylinder liner kits, cylinder head gasket, engine gasket kits and Other core engine parts.

 

3. What scenario can your product be applied?

 

Our products are widely used in power fields such as construction machinery, generator set, commercial vehicle, passenger car. agricultural machinery, ship, etc.

 

4. Which countries and regions are your market extend all over?

 

Our markets includes North America, Western Europe and the Middle East, Southeast Asia, Africa South America and all over the world,for example:USA,Germany and Australia,UAE and Brazil and so on..

 

5. What is the standard of package?

 

We have Japanese TP Brand package, also have wooden case/carton/standard shipping package,Or custom-made packaging.

 

6. What is the delivery time?

 

Generally, we will arrange the goods within 24 hours after your payment; If some items are no stock, it will take 30-45 days to produce after received deposit.

 

7. What kind of payment terms do you have?

 

L/C, D/A, D/P, T/T, X-Transfer is also acceptable.

 

8.How can I get a quotation?

 

A complete quotation based on the details as follows in your inquiry:

a.Excavator brand name;

b.Excavator model number;

c. Engine model;

d.Part number;

e. Pictures;

f.Quantity;

g.Other requirements, such as Packing, Shipping and so on.

 

9.How do you pack the goods?

 

The products will be carefully handled by three steps:

a: Wrapped with packing paper or plastic bag;

b: Japanese TP brand box or customized box;

c: Put in an appropriate carton box or wooden boxes and be fixed firmly.

 

10.How can I know the status of my order?

 

We will keep you udpate the process of the preparation, to ensure all issues are resolved prior to the delivery.products pictures can be provided if required. We shall send out the goods immediately after confirmation and you will get the tracking information right away

 

11.How to guarantee your service?

 

· Strict inspection during production

· Strictly check the products before shipment to ensure our packaging in good condition

· Track and receive feedback from customer regularly

 

12.What will you do about quality complaint?

 

·We will respond to customer within 24 hours.

·Our QC will retest the same item in the warehouse, if confirmed it is quality problem, we will make corresponding compensation.

 

13.What is the warranty time of the products?

 

The warranty time is 18 months based on the item details; We don't provide warranty time for original and used products.

Hot Products

Caterpillar 3406&C15 Diesel Engine Cylinder Liner for Construction Machinery PRICE NEGOTIABLE ...
Mottling Boring Semi-finished Liner fit for CAT 3500 211-7826 for Engineering Machinery PRICE ...
CAT C10/C12 Overlapping Crosshatch Cylinder sleeve Steel Chroming for Excavator PRICE NEGOTIABLE ...
CAT C10/C12 Overlapping Crosshatch Cylinder sleeve Steel Chroming for Excavator PRICE NEGOTIABLE ...
CATPILLAR 3208/3160/1160 Cylinder Liner for Forlift&Crane Engine Parts PRICE NEGOTIABLE WARRANTY 18 ...
1609874 Caterpillar C16 Diesel Engine Cylinder Liner 1979322 For Construction Machinery 132-6881 The ...