Home Companies Shandong Dehui Fermentation Intelligent Equipment Co.,Ltd

1 Ton Per Batch Malting Equipment Germinating And Kilning Box For Malt Plant

Shandong Dehui Fermentation Intelligent Equipment Co.,Ltd
Active Member

Contact Us

[China] country

Address: Shandong, China

Contact name:Zhou Marvin

Inquir Now

Shandong Dehui Fermentation Intelligent Equipment Co.,Ltd

1 Ton Per Batch Malting Equipment Germinating And Kilning Box For Malt Plant

Country/Region china
City & Province shandong
InquireNow

Product Details

1 Ton Per Batch Malting Equipment Germinating And Kilning Box For Malt Plant

 

 

1
Germinating and kilning box

1.

Capacity: 1T/Batch; Including Sieve Plate
2.Length*width*height:

will be designed according to your plant area;
3.Chest Wall Thickness: 2mm
4.

Malt Turner Boosting Speed:
0.4-0.5m/Min;
5
Malt Turner Rotating Speed:8-9R/Min


set
1 SS304

 

NOTE:

1. The above price is based on EXW Qihe basis.

2. Payment Term: T/T (50% payment in advance, 50% before shipment)

3. The offer is valid in 30days.

4. This price doesn’t include the installation and testing costs in field fabrication.

5. If buyer asks seller to provide staffs to install and adjust equipments, buyer is responsible for these staffs’ tickets, visa, wages, accommodation.

 

 

 Operation
1) Turn on master switch for power supply.

2) Turn on water valve to add water into all water tanks. Be sure to reach water level specified. Turn on compressed air valve.

3) Press temperature control buttons to preheat water in tanks.

4) Set sterilizing temperature and temperature alarm (upper limit temperature and lower limit temperature) in Temperature controller. In general, you just need to set sterilizing temperature.

5) Turn on steam valve manually to preheat water in water tank at cooling section. Water temperature is displayed on thermometer.

6) When water temperature reaches the set point (PV display area), start bottle input /output conveyors to transfer full bottles into this machine.

7) When you finish sterilizing operation, you shall turn off steam valves and water supply valves at first, then stop all spray pumps, at last, stop mesh belt conveyor and bottle input /output conveyors.
.

 

Hot Products

Это Китайскийизвестный производитель оборудования для пивоварения ,производства крафтовогопива,солод...
это Китайский известный производитель оборудования для пивоварения ,производства крафтового пива,сол...
это Китайский известный производитель оборудования для пивоварения ,производства крафтового пива,сол...
Complete quality control and management systems: We have acquired ISO 9001:2008 certificate, ISO ...
Electric 50Hz 3 Phase Packing Production Line , Bottle Can Depalletizer Machine Summary This ...
Double-layer container kits with thermal insulation: 1. Protection cover 2. The first part of the ...