Chongqing Gold Mechanical Equipment Co.,Ltd. |
|
GDKC-2000 Transformer Load Voltage Adjustment Switch Tester
General Summary:
The tester can record switch operation waveform in overall process.
The longest time is 4s.
It can test various parameters such as transition waveform,transition time,transition resistance and three phase synchronization one time and analyze results automatically.
It has power-off protection,over-voltage protection,perpetual clock and high-speed printing.
Technique index:
Three way independent test power,the maximum output current is 0.5A.
Processing part: 80C320 high speed 8 digit microprocessor High speed A/D converter,the Maximum sampling rate can reach 400KHz
Tester set sampling rate:10~20KHz
Maximum save time of single waveform:4s
Transition resistance measuring scope:0~40ohm
Measuring precision:△≦10%
Power supply: 220V+/-10% power:200W
Size: 410*320*260mm3
Weight: 20kg