Home Companies Zhengzhou Duorui enterprise Co., Ltd

Tie Nut Construction Formwork Accessories Take 140 Up To 150 Blows Before Break

Zhengzhou Duorui enterprise Co., Ltd

Contact Us

[China] country

Trade Verify

Address: A Block, Hanghai Square, Erqi District, Zhengzhou City, Henan, China

Contact name:Xu

Inquir Now

Zhengzhou Duorui enterprise Co., Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Tie Nut Construction Formwork Accessories Take 140 Up To 150 Blows Before Break

Country/Region china
City & Province zhengzhou henan
Categories Formwork
InquireNow

Product Details

Formwork Tie Nut Take 140 Up To 150 Blows Before Break:

 

The nut and plate is being turned on a tie bar, to clamp formwork plates. The formwork plates make a mould to poor a concrete element.
After the concrete has hardened, the formwork plates have to be removed by losening the nut. While the nut is very firm, they use hammer blows to loosen. After 2 or 3 blows the nut is loose and can be turned of.

To test quality, customer counts the amounts of hammer blows before the nut breaks. Our cast iron wing nut with heat treatment can take 140, up to 150 blows before break.

 

 

 

Specification of Formwork Tie Nut Take 140 Up To 150 Blows Before Break:

 

Tie nut typesFormwork wing nutFormwork Ancher tie nutSwivel formwork tie nut
Weight0.175/0.25/0.3/0.61kg0.16/0.36/0.5/0.6/0.65/1kg1.25/1.3kg
Pull strength140-150KN170-180KN170-180KN
Photo
ProcessCasted
Surface treatmentNatural, Electric Galvanized ,Hot Dip Galvanized
Heat treatmentFor enhance nut's hardness, tensile strength, etc
Match tie rod12/17/20MM or customized size
MaterialDuctile casted iron QT450-10
ColorSelf-color (black), silver galvanized or golden galvanized

 

 

Advantages of Formwork Tie Nut Take 140 Up To 150 Blows Before Break:

 

OEM service

* products, logos, package, all could be customized as request.

 

First-Hand price

* Manufacturer with trade ability* Professional foreign trade business and service team* OEM available

 

High Quality

 

* Can take 140, up to 150 blows before break.
* Heat treatment and nice galvanized surface.
 
Stable Supply
* Two casting & one welding factories to sure stable supply.
* All factories have Government-approved environmental qualifications
 

 

What else we supply:

We also supply formwork accessoris, tie nut, tie rod, plastic sleeve, cone, formwork plate, water stopper, scaffold props, scaffold frame, scaffold coupler, jack base, plastic rebar caps, plastic roman pillar, plastic safety fence, OEM service. Please feel free to contact us for one stop shopping of construction products from China, best price and service will be offered!!!

 

Hot Products

Scaffold Scaffolding Metal Painted Acro Props Shoring Jack Adjustable Steel Post Shores for ...
Telescopic Scaffold Walk-Thru Shoring Frame Adjustable Steel Jack Post Shore Diameter of inner tube ...
Shoring Props Scaffolding Jack Post for Formwork Supporting Diameter of inner tube 40mm, 48mm, etc. ...
Handheld Props for Beam Formwork Supporting Diameter of inner tube 40mm, 48mm, etc. Diameter of ...
Construction Used Telescopic Cup-Nut Display Prop Acro Jack Post Advantage of Construction Used ...
Metal Adult Shoring Props Construction Concrete Supports Screw Jack Post Advantage of Metal Adult ...