Home Companies Changsha Tongchuang Mechanical Co., Ltd.

Inclined Belt Suspension Reducer Gear Assembly Of Concrete Batching Plant Parts

Changsha Tongchuang Mechanical Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: 169 Renming East Road, Changsha, Hunan, China

Contact name:JiLiu

Inquir Now

Changsha Tongchuang Mechanical Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Inclined Belt Suspension Reducer Gear Assembly Of Concrete Batching Plant Parts

Country/Region china
City & Province changsha hunan
InquireNow

Product Details

Inclined belt suspension gear reducer assembly of concrete batching plant parts

 

 

Inclined belt suspension gear reducer assembly of concrete batching plant parts
NameInclined belt suspension gear reducer assembly
Place of originTianjin, China
Brand nameTianjin Bai Li Tian xing speed reducer
Applicable modelZoomlion HZS120/HZS180 concrete mixing station
Specifications and modelsZGY625/ZGY710
Weight290KG
Rotational speed1400 rpm
Drive ratio1:12.3
Power113KW
FunctionDrive device of inclined belt conveyor in Zhonglian mixing station.
Supply capacity20 Pieces/month
PackingExport standard packing
Minimum order1pcs
PriceNegotiatable


 

Product features and advantages:

ZGY suspension gear reducer is a kind of hard gear reducer, and the gear is made of high-strength low-carbon alloy steel. The gear has the characteristics of high precision, high hardness, small size, large vehicle capacity, high efficiency, simple structure, easy installation and maintenance of ZGY710.100, and can be equipped with anti-reverse device. The input shaft of the reducer is connected with the motor by belt pulley, and the output is connected by single key of hollow shaft, which can replace electric drum as the power source of belt conveyor and hoist.

 

 

Maintenance method:

L-CKC150 intermediate gear oil is recommended for lubrication of reducer. When using the backstop, lubricating additives such as molybdenum disulfide should not be used in the reducer. After refueling, replace the new oil after running for 200 hours. Work continuously in the future, and change the oil every six months or every 2,500 hours.

 

 

Hot Products

Product Description: SANY Concrete Pump Parts are designed and manufactured to meet the highest ...
Product Description: Sany Concrete Pump Parts are known for their quality, reliability and ...
List of available parts 1 A810301010638C elbow 2 A810301010927C pipe clamp 3 A810301010926C elbow 4 ...
Concrete Pump Trucks Parts CMFDA-E320-ALPS CMFDA-E310-ALPS CMFDA-E325-ALPS Product Description: ...
Transfer Box, Force Collector,PTO (Power Take-Off) 10234443 Number Code Name Quantity 1 A82040500008...