Home Companies Beijing Zulin Formwork & Scaffolding Co., Ltd.

Steady Auto Self Climbing Formwork ZPM-100 for construction of high buildings and towers

Beijing Zulin Formwork & Scaffolding Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: Juyuan Industry Field No.20, Mapo Town, Shunyi District, Beijing, P.R. of China, 101300

Contact name:Britney Yuan

Inquir Now

Beijing Zulin Formwork & Scaffolding Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Steady Auto Self Climbing Formwork ZPM-100 for construction of high buildings and towers

Country/Region china
City & Province beijing beijing
Categories Formwork
InquireNow

Product Details

Steady Auto Self Climbing Formwork ZPM-100 for construction of high buildings and towers

Descrition:


Introduction

 

The lifting power of Auto-climbing Formwork System ZPM-100 comes from the hydraulic system, which includes the oil 

cylinder and commutator. The steel rail and the bracket can climb alternately, and therefore the whole formwork system

 climbs steadily. Cranes are not needed during the construction. It’s easy to operate,highly active and safe. It’s the best

 choice for construction of high buildings and towers.

 

ZPM-100  Structure Sketch

 

 

 

The Characteristics


1 The system is able to climb as a whole or individually, and in a stable way.
2 As the system climbs by itself and cleaning work is done in situ,  tower crane lifts are greatly reduced.
3 It’s safe and convenient to operate, and labor and material costs will be greatly slashed. 
4 The bracket will not come back to the ground until the construction is finished. Field spacing will be reduced and

 the bumping damages can be almost prevented, especially for the panels.
5 The climbing process is steady, synchronous and safe.
6 All-purpose platforms are provided, and there is no need to set up additional operation platforms, which means 

saving the labor and material costs again.
7 There is little margin for error. And if there is, it is simple and easy to correct. Deviations of construction work can 

be eliminated floor by floor.  
8  Fast climbing speed can be achieved, and the construction cycle will be maintained according to schedule. 

 Project Application 

 


Project Name:Yongjiang Bridge (Ningbo,China)

Builder:CCCC.First Highway Engineering Bureau

Hot Products

Table Formwork Module Steel Waler Slab Table Or Custonized Slab Tables With OEM Descrition: Table ...
Flexible floor Table Module Steel Waler Slab Table or custonized Slab Tables Table Formwork Flexible ...
2440 * 4880mm Table Formwork System with Slab Formwork for Industrial Buildings Descrition: Table ...
Ring-lock Scaffolding Table Formwork Permanent Slab Scaffold Formwork with Adjustable Scaffoldings ...
Adjustable Height Table Formwork Shifting Trolley with Attached Frame Construction Equipment ...
Ring-lock Scaffolding Table Formwork Permanent Slab Scaffold Formwork with Adjustable Scaffoldings ...