Home Companies Beijing Zulin Formwork & Scaffolding Co., Ltd.

Floor Slab Formwork System Widely Used in Concrete Pouring of Slabs

Beijing Zulin Formwork & Scaffolding Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: Juyuan Industry Field No.20, Mapo Town, Shunyi District, Beijing, P.R. of China, 101300

Contact name:Britney Yuan

Inquir Now

Beijing Zulin Formwork & Scaffolding Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Floor Slab Formwork System Widely Used in Concrete Pouring of Slabs

Country/Region china
City & Province beijing beijing
Categories Formwork
InquireNow

Product Details

 

Floor Slab Formwork System Widely Used in Concrete Pouring of Slabs

 

 

Descrition:

 

Product Name:Nonstandard Slab Formwork

 

Nonstandard slab formwork is widely used in concrete pouring of slabs. Floor props or scaffoldings with 

supporting heads are the supporting system. The main beam and secondary beam are timber beams with 

plywood on the topside. The system has many advantages, such as simple structure, easy assembly and 

dismantling, flexible location and being able to reuse.



The supporting head series

In concrete pouring of the slabs, supporting head series support the slab formwork. Some of them can

 move early or quickly. Subject to the demand, various kinds of supporting heads are able to work together, 

thus making construction work much more efficient.





The Sketches  

               Cross head

            U-head 

                               

 

 

Early striking ring head assembly

Early striking head

Lowering head

  


 

Early Striking Head Disassembly Progress  

 

 

 



 



    After concreting, 

hit the pin plate to let it move.
 


  
   When the pin plate 

move to the right position,

 the movable part of the 

head and main beam will come down.

    Remove the main 

beam for reuse.

 


 Lowering head Disassembly Progress

 

     After the concrete pouring, 

hit the pin plate to let it move.


   
    
    When the pin plate 

move to the right position, 

the main beam, secondary

 beam and plywood 

will come down in order.
 


    
     Remove the timber beams, 

plywood, lowering heads 

and floor props.
 

 

 

Hot Products

Table Formwork Module Steel Waler Slab Table Or Custonized Slab Tables With OEM Descrition: Table ...
Flexible floor Table Module Steel Waler Slab Table or custonized Slab Tables Table Formwork Flexible ...
2440 * 4880mm Table Formwork System with Slab Formwork for Industrial Buildings Descrition: Table ...
Ring-lock Scaffolding Table Formwork Permanent Slab Scaffold Formwork with Adjustable Scaffoldings ...
Adjustable Height Table Formwork Shifting Trolley with Attached Frame Construction Equipment ...
Ring-lock Scaffolding Table Formwork Permanent Slab Scaffold Formwork with Adjustable Scaffoldings ...