InquireNow

Product Details

Zoomwolf Concrete Pump Ultra-high pressure

 

 

Name of parameterUnitHBT100S26220C
Output capacitym3/h54(high pres.)/103(low pres.)
Output pressureMPa26(high pres.)/13.4(low pres.)
Distribution Valve S Valve
motor model 2-Y2-315S-4
Rated power of motorkW110+110
Rated rotating speed /voltagerpm/V1480/380
Displacement of the main oil pumpml/r260+260
Oil pres.of the pumping systemMPa32
Delivery cylinder diam.×strokemmΦ200×1800
Hydraulic system circle formTwin-pump and -circuit open sys.
Hopper volumeL800
Feeding heightmm1400
Oil tank volumeL1000
Max.grain sizemmpebbleФ50,crush.stoneФ40
Overall dimension L×W×Hmm6650×2270×2215
Total masskg9750

 

Vertical rising pipeline laying

① The rising lines can be laid along elevator well,scaffold or through prefab hole of floor in order to dismantle pipelines conveniently.

② Use new delivery lines when laying rising lines;when height is big,the thick wall pipes must be used at the bottom and are easy to dismantle;Elbows of vertical pipelines can't be used for the purpose of supporting,every lines should be supported by 1-2 bolsters.Straight and bent pipes must be fixed on wall,scaffold,tower or lift well in order to conduct the concrete gravity of lines from bolsters into the building.

③ As the vertical lines rise to a great height,the delivery concrete may incline to flow backwards,and give an impact to S valve.In order to reduce the shock,a certain length of horizontal lines should be laid between the machine and vertical lines to resist the concrete flowing backwards.The length of horizontal lines is not less than the 15%length of the vertical lines,and the shut-off valve should be installed at the horizontal lines of machine outlet,if delivery the concrete at high level.

④ If the pumping distance is very high and the volume of concrete output is large,you can lay two group parallel lines.If one group line is blocked,another pipeline can continue working.

 

 

 

 

12-fig.(1) Vertical rising pipeline laying

 

 

Vertical lines laying downwards

 

If delivery concrete downwards,when the drop in height exceeds 6m,the pipeline should be laid as the following figure to avoid concrete isolation;when pumping mortar,push the sponge ball into pipelines every 20-30m in height to ensure operation normally.

 

 

 

13-fig.(1) Vertical lines laying downwards

Hot Products

Technical Specifications Model of placing boom HGY29S-3R HGY29P-3R HGY29SC-3R HGY29PC-3R Performance ...
Professional Placing Boom Concrete Pump Remote Control ISO9001 Certification Features Optimal design ...
380V/50HZ Concrete Placing Boom Floor Or Shaft Climbing Features Optimal design of boom-&column...
Construction Buildings Boom Pressure Concrete Pump Inner Hydraulic Oil Tank Features Optimal design ...