Home Companies Chanchiyo Holdings Group

OEM Hydraulic Wheel Loader 6100kg 650mm Dump Reach

Chanchiyo Holdings Group

Contact Us

[China] country

Trade Verify

Address: No.812, Nandidong road, Qiaonan street,Panyu district, Guangzhou city, Guangdong,China.

Contact name:Jell Young

Inquir Now

Chanchiyo Holdings Group

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

OEM Hydraulic Wheel Loader 6100kg 650mm Dump Reach

Country/Region china
City & Province guangzhou guangdong
InquireNow

Product Details

Hydraulic Wheel Loader OEM Manufacture Rich Experience In Loaders Exporting

 

1. Products Description

In general, for construction machinery, the four most important factors are: price, quality, operation, and after-sales.

 

The amount of shovel material and the stability of the loader depend on the cooperation of the loader frame.

The flexibility and light operation mainly depends on the hydraulic system of the loader.

The low failure rate depends on quality as well as the after-sales service.


MCLLROY wheel Loaders are widely used in the construction, municipal engineering, urban and rural gardens, lime, sand, cement factories, mines and other enterprises and institutions and departments. It is particularity applied to the narrow space for the loading operation of stone,sand and other construction materials.

 

2. Specification

MODELMCL 940
ENGINEEngine ModelYun Nei 4102 Supercharged
RPM2400
Rated Power76 kW
EmissionsEU Stage II
WEIGHTSOperating Weight6100 kg
Rated Load2800 kg
BUCKETSBucket Capacities1.2 m³
TRANSMISSIONMax. Travel Speed28 km/h
Gear BoxCVT
280 torque converter
AxleLarge hub
Axle Base2560 mm
BrakeAir Brake
HYDRAULIC SYSTEMHydraulic Cycle time - lift≤ 6 s
DIMENSIONS(APPROXIMATE)Min. Ground Clearance400 mm
Wheel Base1640 mm
Reach at Max.Dump Height3500 mm
Dump Reach≤ 650 mm
Overall Length - With Bucket6240 mm
Overall Width2040 mm
Overall Height2830 mm
OPERATING SPECIFICATIONSTyre Size1670-24
Breakout Force52 KN
JoystickMachanical
Min. turning radius≤ 6200 mm
STANDARD EQUIPMENTHour meterYes
Tool BoxYes
Dual Hight&Low Speed HandleYes
OPTIONAL EQUIPMENTAir Conditioning/heaterOption
Quick ChangeOption
Multifunctional AttachmentOption
Hydraulic PilotOption

 

3. Details and Advantages

The main components of the loader are used brand-name manufacturer's products, interchangeability of good, reliable, well-resourced parts.

1) Engine:Domestic famous engines ,green/turbocharged/inter-cooled engine.

2) Transmission:Wet multi-plate clutch automatic transmission ,torque converter ,stable performance ,famous brand in China.

3) Axle: Heavy-duty axle ,planetary reduction ,solid and durable ,with the corresponding tires ,for the loader to provide.

4) Hydraulic system:High Efficiency and energy conservation patented dual-pump confluence technology .

5) Tire:38% Rubber content tire,Wider off-road tire

6) Frame:The newest design ,small center precision turning radius, stable and thickened frame,strong and durable.

7) Cab:

I. Radio.

II. Air conditioner.

III. Central electrical control box for easier servicing.

VI. Hydraulic brake system gas cap,caliper disc brake.

8) Gull-wing Engine Doors make access and daily maintenance easy.

 

 

4.Production lines:

A complete production process mainly includes: material procurement-steel plate cutting-welding-spray painting -drying-assembly-inspection

Assembly:

Our factory arrange seven steps for assembly. There are over a thousand parts in a loader. I will talk about assembly of major components.

 

The second step is connecting engine and gearbox, then the third step must be putting them onto the frame.

Put engine on the frame, connect the priority valve, install radiator and water tank;

Add hydraulic transmission oil to the gearbox (add gear oil for mechanical transmission), install the hydraulic transmission oil radiator and pipeline, install the hydraulic oil radiator (the pipeline does not need to be connected), connect the brake caliper pipeline, brake pipeline, connect main reduction (differential) drive shaft.

There are quite so many pipelines here, this step could use many screws and clamps.

In this step, first of all, we must pay attention to the four feet of the frame where the engine is fixed, they have to be level, otherwise, the force is uneven, and there is a risk of cracking in the engine and gearbox housing; and the connection point of the radiator must be fixed with sealant; and then see if the clamp is tight; whether the screws of the transmission shaft are tightened.

2-3 workers will be in charge of this step.

 

 


 

hydraulic wheel loader
small front end loaders
mining front end loader
agricultural wheel loader
heavy machinery loader

Hot Products

Front End 1.5 Ton Wheel Loader Air Brake 1. Products Description We need the construction machine to ...
Compact 1.5 Ton Wheel Loader Yunnei Engine YN490 1. Products Description In general, for constructio...
Front 1.5 Ton Wheel Loader 42KW 57hp Rating Power 1. Products Description If you're looking for a ...
Mini Shovel 1.5 Ton Wheel Loader Cycle time within 7s 1. Products Description MCLLROY wheel loader ...
Small 1.5 Ton Wheel Loader Wheel Base 1490mm 1. Products Description We need the construction ...
Air Brake Front End Wheel Loader, 42KW 57hp Rating Power Mini Shovel 1. Products Description In ...