ECOOL INTERNATIONAL TRADING (Shanghai) Co., Ltd. |
|
EMP10 Industrial Cold Storage , 4000 Tons Cold Meat Storage With Quick Freezing Rooms
Quick details:
Cold room specification:
Room function | Designed temperature range | |
°C | °F | |
Processing warehouse air conditioning | 2 ~ + 10 | +35.6~+50 |
Finished product low-temperature storage | -25~-18 | -13~-0.4 |
Product blast freezing | -40C~-35C | -40~-31 |
Corridor for temperary store | 4-5 | 39.2~41 |
Compatitive Advantages
1. Nice appearance :The insulation panel and framework are available in dozens of colors which are to be elected in satisfactory harmony with various styles of buildings.
2. Insulation : Polyurethane or polystyrene with low thermal conductivity and high strength is utilized, achieving good insulation performance.
3. Short construction period
4. Fast installation
5. Hygienic conditions of food inside cold stores are up to the standards.
6. Durable building structure, super quality material
7.Remote online monitor system is available
8 Life long technical support
Application
Meat processing factory
Steps of purchasing customized cold storage
Step | Contents | Details |
1 | Client describe the requests and using methods | 1. Client provides some basic requirements; |
2. Client provides relative information: | ||
1) construction address, environment, weather, geology conditions, electricity supply; | ||
2) storage purpose and functions; | ||
Other design requirements | ||
2 | We offer sketch design and pric | 1. Communication on details, discussion and modification until reach an agreement; |
2. sketch design; | ||
3. price offer on all systems | ||
3 | Contract and formal design | 1. Sigh the former design contract (if any); |
2. Site survey and measurement (if necessary); | ||
3. Formal design and delivery; | ||
4. Details of solution and price. | ||
5. Client prepare the construction site and foundation. | ||
4 | Equipment and material export | 1. Sign the contract of equipment and materials; |
2. production and export preparation | ||
3. Client prepare the on-site electricity and water | ||
5 | Installation | 1. working procedure confirm and team organization; |
2. Construction teams go to install. | ||
6 | Check and acceptance | 1. Our technicians trial run the cold storage on-site; |
2. Client check and make acceptance. | ||
7 | Operation instruction and warranty | 1. training clients’ cold storage operators; |
2. provide technical support within the lifetime of cold storage. |
Cold room photos