Wuxi Sylaith Special Steel Co., Ltd. |
Verified Suppliers
|
|
Flange Plate Color Painted Q195 Q235 DX51D SGC400 PPGI Galvanized Steel Coil
Production Description
PE polyester color-coated sheet has good adhesion, rich color, wide range in formability and outdoor durability, medium chemical resistance, and low cost. The advantages of PE polyester color-coated board are mainly cost-effective, and it is recommended to use PE polyester color-coated board in a relatively friendly environment.
The high corrosion resistance of PVDF profiled color-coated coils. Many workshops with strong corrosive environments will choose PVDF profiled color-coated coils, and there are often humid sea breezes at the seaside, which are more corrosive.
Specification
Thickness | 0.12-6.0mm or as required |
Width | 600-1500mm or as required |
Technique | Cold Rolled, Hot Rolled |
Standard | ISO, JIS, ASTM, AS, EN |
Quality | SGS Inspection |
Coil weight | 3-8MT/ Coil or as your request |
Zinc coated | 30-275g/ m2 |
Color | Refer to RAL numbers or customer sample,common colors are sea blue, white grey and bright red. |
Grade | Q195 Q235 Q345 SGCC SGCH SGC340 SGC400 SGC440 SGC490 SGC570 DX51D DX52D DX53D DX54D DX55D DX56D DX57D S220GD S250GD S280GD S320GD S350GD S400GD S500GD S550GD SS230 SS250 SS275 |
Application | Pre-engineered steel buildings, industrial and commercial roofing
and cladding, agricultural buildings, building accessories, light steel framing, Quonset huts, construction tubular, appliance, and automotive |
Product Details
1. What is the QC system?
We have QC staff of 5 persons and advanced equipment, each production is with MTC traced from Aluminum ingot lot. According to the standard we will inspect every producing step.
2. How many tons one 20 GP or 40 GP could load?
One 20 GP could load about 20 tons. And 40 GP load about 24 tons.
It depends on the different specification.
3. How long does your delivery time take?
In general, for Stocks, we can send the goods to loading port
wiyhin 7 working days after receiving the deposit; for production
period,it usually needs about 15 days ~30 days after receiving the
deposit.
4. What is the MOQ?
Usually we set 1 Ton MOQ, but the more, the cheaper. Besides, we
are happy to make prototype or sample for clients to ensure quality
standard.