Project: Algeria light steel structure workshop
Building Type: portal frame factory building,one storey
Location:Algeria,North Africa
Construction area: 20124m2
Structual steelwork consumption:703,000kgs
EXCEEL(material list)
Steel Contents:
1. the building site: SARL LUK MAAN IMPEX,Algeria
2. the local wind load is 70kg/m2,and the snow load is 90kgs/m2
3. the structural steelwork material is hot-rolled H steel, with
posts IPE450,farms:IPE450,pits:HEAN140,
failures:HEA140,girts:IPE140,bracing:70x70x7
4. the cladding system :roofing EPS sandwich panel with 24kg/m3
density and wall EPS sandwich panel with 24kg/m3
5. the building units
first steel building is 20m x 60m x 6m
second steel building is 27.170m x 40m x 8m
third steel building is 20m width x 35m length x 6m height
fourth steel building is 78mx24mx6m
fifth steel building is 60mx12mx6m
sixth steel building is 145.45m x 100m x10m height 6. inside the
first steel bulding and second steel building,equipped with 2 units
of 8t cranes.