Home Companies Pultruded FRP Online Market

FRP Maintenance Stairway Cooling Tower Parts , Customized Height

Pultruded FRP Online Market

Contact Us

[China] country

Trade Verify

Address: Room 501, unit 6, building 20, North Lane, east flower market, Beijing

Contact name:cschen

Inquir Now

Pultruded FRP Online Market

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

FRP Maintenance Stairway Cooling Tower Parts , Customized Height

Country/Region china
City & Province beijing beijing
InquireNow

Product Details

 
FRP Maintenance Stairway Cooling Tower Parts , Customized Height
 
 
Quick Detail:
 
The manufacturing process for FRP product consists of 7 processes: Raw materials preparation, Mold preparation, Hand paste molding, Solidify, Take off the mold, Disposal, Inspection (see the diagram as below). Each Technique has to be conducted according to the Operation Manuel.
 
 
Specifications:
 

MODEL

Total Max Width

Total Max Height

Width of per step

Height of per step

Width of non-slip surface

Width of top  non-slip surface

Max

840mm

1980mm

228mm

220mm

120mm

100mm

The height could be adjusted by client’s requirement.

 
 
Description:
 

  1. Molding Condition:

     To assure the quality of the accurate FPR product, the molding should be under flowing conditions:

  • keep a constant temperature between 15 to 25℃ in the FPR molding workshop.
  • keep the humidity under 75% in the workshop too.
  1. Raw materials Preparation

     The raw materials used for FRP product are as follows:

  • Fiberglass fabric and Fiberglass Felt
  • Resin
  • Coating
  1. Mold Preparation
  • Make the fiberglass mold according to the inner shape of the product and the precision requirement.
  • Make sure it is smooth and no default on the surface.
  1. Hand Paste Molding Technique
  • Spray resin coat by American Douglas coat spray machine on the surface of the mold.
  • Pre-make the reinforced bar according to drawings.
  • Put the pre-make reinforced bar in the right place, and wrap it with fabric until it gets to the designated depth.
  • Examine if the edge is leaking and it still has bubbles after pasting.
  1. Solidity
  • Make sure the solidify temp. is 25%±3℃, the humidity not above 80%(The workshop must be thermostatic and desiccative.)
  • The mold cannot be taken off until it has been solidified for 10 hours (solidifying temperature 25±3℃) and the degree of cure has reached 80% ( Barcol rigidity> 41).
  1. De-molding
  • Push the mold out, prize and press are not allowed.
  • Put the De-molding product on the soft fabrics and then move to the designated place in case distortion or abrade.
  1. Final disposal
  • Get rid of the thorn, bubbles on the surface, spray resin after the cleaning job.
  • Cut the edge according to the design requirements.

 
 
Applications:
 
For maintenance
 
 
Competitive Advantage:
 
1.Non-slip and firmly
2.Convenience for Maintainence
3.Long life
4.Ageing Resistance and Ultraviolet
 
 
 





 






























Hot Products

Packaging Details carton / pallet Port Shanghai / Ningbo Picture Example: Lead time: Quantity(sets) ...
Carlyle refrigeration compressor rack For Blast Freezer Ourfuture compressor rack include: ...
High Temperature air cooled condensing units with R404a R22 Refrigerant​ Ourfuture compressor rack ...
High Temperature Air Cooled Screw Chiller for apple cold room Ourfuture compressor rack include: ...
Air cooled Refrigeration Condensing Unit for cold storage room Specifications: Compressor condensing ...
Stainless Steel Model Cleaner For Die Casting And Inject Model Quick Detail: Model cleaner are ...