Home Companies KOMEG Technology Ind Co., Limited

Rapid-rate Temp Change Test Chamber (Environmental Stress Screening)ESS Chamber

KOMEG Technology Ind Co., Limited
Active Member

Contact Us

[China] country

Address: Building 12, Songshan Lake, Small and Medium-Sized Science and Technology Park, Dongguan City, 523808, Guangdong Province, P.R.China

Contact name:KOMEG

Inquir Now

KOMEG Technology Ind Co., Limited

Rapid-rate Temp Change Test Chamber (Environmental Stress Screening)ESS Chamber

Country/Region china
City & Province dongguan guangdong
InquireNow

Product Details

 
Rapid Temperature Change Environmental Cycling Test Chamber 100mm Cable Port
 
OEM are welcome , more detail information ,pls kindly contact :anna@komegtech.com  Wechat&Whatsapp :+86-18098281986
 
 
Applications :
 
Applicable to environmental adaptability and reliability test in such industrial units as electronics, electrical
 
appliance, battery, plastics, food, paper product, vehicle, metal, chemistry, building material, research
 
institution, inspection and quarantine bureau, university etc..
 
 

Ⅳ.Main Technical parameters
 

1. Chamber (Water cooled ,ambient temperature +25℃,no load )
 

1.1 Workspace volume

W1000 × D800 × H 1000 mm
 

1.2 Exterior size

W 1600 × H 2330 × D 3195 mm (Approx )
 

2. Temperature
 

2.1 Temperature range

-70℃~+150℃
 

2.2 Temp Deviation

≦±2.0℃
 

2.3 Temp Stability

±0.5°C
 

2.4 Temp Uniformity

≤±2.0°C
 

2.5THeating up time

From -40⁰C to up to +85⁰C, linear 20⁰C/min (Dead load 30Kg iron)
 

2.6 Cooling time

From +85⁰C to up to -40⁰C, linear 20⁰C/min (Dead load 30Kg) iron without heating
 

2.7 Temp Control ramp

From 20°C to 85°C (20°C/min) +85°C dwell for 23 minutes,
From 85°C to -40°C (20°C/min)-40°C dwell for 23 minutes
From -40°C to 20°C (20°C/min) in 3 minute ramp

*Temperature performance test is based on the relevant provisions of IEC60068 -3 standard
 
measurement; sensor placed in the unit outlet

Ⅴ,Chamber Structure

Overall structure and chamber was composed of three parts as below.
 
Insulation box, separate refrigeration units, and electrical control cabinet.

1.Insulation box

wall material: high-quality carbon steel with static color spray
 
 inner wall material: SUS304 # matte stainless steel plate
 
Insulation materials: rigid polyurethane foam insulation layer + glass fiber.

2.Door

Single door ,left open ,Heating wire was installed at the door frames to
 
prevent condensation at low temperatures.

3Observation window

With observation window(specific size according to design) multi-hollow
 
electric insulation coated glass prevent condensation effectively

4.Cable port

Φ100 mm located on right sides with rubber stopper and plastic cover
 

5.Lighting device

LED One type located on observation window
 

6. Heater

High quality nickel-chromium wire electric heater, non contact control (SSR)
 

7.Condensate drain outlet

With workroom condensate and condensate drain
 

8.Shelf for samples

stainless steel sample holder 2pcs,Adjustable, load capacity 30kg/ layer
 

9.Mobile Casters

Mobile Casters *4 with foot cups
 

10.Electric control box

Total power circuit breaker, over-temperature protection.
 

Ⅵ,Freezing system
 

1. Compressor

Bock /Bizer Semi-Hermetic Compressor from Germany
 

2. Refrigerant

Environmental-friendly refrigerant: R404A ,R23
 

3. Condenser

Shell and Tube condenser(Water -cooled)
 

4. Evaporator

Fin-type multi-stage automatic load capacity adjustment, No frost in long-
 
term use of low temperature and humidity conditions

5. Other accessories

Use internationally-known brand, such as high precise expansion valve,
 
oil extractor, dryer and many other accessories.

6.Refrigerant flow control

Adjust energy consumption output and control automatically to the
 
refrigeration system.

7.Refrigerant flow control

Adjust energy consumption output and control automatically to the
 
refrigeration system.

 

. Electrical control system
 

1. Control cabinet

A. Emergency stop switch
B. Power switch
C. Over-temperature protection
D.RS-485 interface
 

3. Protection System

A. Heater protection switch if no water
B.Heater over-current circuit breaker
C.Circulating fan over-current overload protection
D. Compressor high voltage protection switch
E. Compressor overheat protection switch
F. Compressor over-current protection switch
G. Over-voltage under-phase protection switch
H. Circuit Breakers
I. Leakage switch
J.Zero-crossing gate fluid power controller
 

5. AlarmEquipment stops running and sends audible alarm when the above protection appears, meanwhile, fault, causes and solutions will be displayed on the screen.
 
Photos show 
 
 

 
Packing Details:
We use PP Film wrapping the test chamber to protect the test chamber from moisture or being scratched first, then use strong plywood case for easyload and transport, and to keep the chambers from potential crash or impact.
 
Photos Show 
 

 

 

Hot Products

100L 3-Zone thermal shock chamber with Independent product testing are Prouduct Application 3 zones ...
High temp chamber :+60℃ ~ +200℃ 150L 3-Zone thermal shock chamber with 7"LCD toch panel Prouduct ...
High Precision Climatic Testing Systems Temperature Humidity And Vibration Three Integrated ...
Single door stainless steel 225L Temperature And Humidity Test Chamber with Two explosion-protected ...
800l Constant Temperature Humidity Test Chamber For Reliability Testing Model KMH-150L KMH-225L KMH...
CE Certified Programmable Environmental Climatic Test Chamber 1. Do you know KOMEG? KOMEG Designed ...