Home Companies KOMEG Technology Ind Co., Limited

Reliability Testing 3 zone Thermal Shock Test Chamber For Physical Damage Testing

KOMEG Technology Ind Co., Limited
Active Member

Contact Us

[China] country

Address: Building 12, Songshan Lake, Small and Medium-Sized Science and Technology Park, Dongguan City, 523808, Guangdong Province, P.R.China

Contact name:KOMEG

Inquir Now

KOMEG Technology Ind Co., Limited

Reliability Testing 3 zone Thermal Shock Test Chamber For Physical Damage Testing

Country/Region china
City & Province dongguan guangdong
Categories Solar Chargers
InquireNow

Product Details

Reliability Testing 3-zone Thermal Shock Test Chamber Physical Damage Testing

 

 

1. Working Principle

 

There are three chambers used to perform thermal shock testing, high-temperature chamber, low-temperature chamber and test chamber. Sample is placed in the test chamber, more extreme temperature than test temperature can be set in high-temperature chamber and low-temperature chamber. When doing low temperature testing, cold chamber door open, and low-temperature chamber working together with test chamber.

When converted into high-temperature test, cold chamber door closed, hot chamber door are opened, and test chamber working together with high-temperature chamber. Conversion of mechanical action (transferring from high temperature to low temperature or low temperature to high temperature) can be completed in less than 1second, and the temperature can be quickly stabilized.

During the whole test, test sample is no need to be moved, and without any human intervention.

 

 

 

2. Description and Application

 

As we know that thermal shock occurs when a thermal gradient causes different parts of an object to expand by different amounts. This differential expansion can be understood in terms of stress or of strain, equivalently. At some point, this stress can exceed the strength of the material, causing a crack to form. If nothing stops this crack from propagating through the material, it will cause the object's structure to fail. Normally we use thermal shock test equipment to test how much amount can a product withstand thermal shock.

Thermal shock testing exposes products to alternating low and high temperatures to accelerate failures caused by temperature cycles or thermal shocks during normal use. The transition between temperature extremes occurs very rapidly, greater than 15 °C/min.

 

3. Specification

 

(1) KTS-A Series

Model

 

KTS-A Series
72A100A150A200A252A300A480A
Inside size(mm)W450500600670700800800
H400450500600600600800
D400450500500600650750
Outside size(mm)W1490154016401720175018501850
H1790184018902000200020002200
D1600170018301850193019802500
Test weight5101215182020
Low Temp Chamber-55ºC~-10ºC, Pre cooling time: ≤ 60 min from +20ºCto-55ºC
Test Chamber-40ºC~+150ºC
High Temp Chamber+60ºC~+200ºC ,Within 20 min, Pre-heating time
Transition time≤15S
Recovery timeHigh-Temp Exposure 30 min to reach & stabilize required hot temp of test sample
Low-Temp Exposure 30 min to reach & stabilize required cold temp of test sample
≤ 5 min
Ambient Temp.+5ºC~+35ºC
PowerAC 380±10% 50Hz ,3 phase 4 wires +Ground Wires

 

(2) KTS-B Series

 

Model

 

KTS-B Series
72B100B150B200B252B300B480B
Inside size(mm)W450500600670700800800
H400450500600600600800
D400450500500600650750
Outside size(mm)W1490154016401720175018501850
H1790184018902000200020002200
D1600170018301850193019802500
Test weight(KG)5101215182020
Low Temp. chamber-70ºC~-10ºC ,Pre cooling time: +20ºC~-70ºC ,≤ 60 min
Test. Chamber-55ºC~+150ºC
High Temp. chamber temperature+60ºC~+200ºC,Preheating time: ≤20 min
Transition time≤15S
Recovery timeHigh-Temp Exposure 30 min to reach & stabilize required hot temp of test sample
Low-Temp Exposure 30 min to reach & stabilize required cold temp of test sample
≤ 5 min
Ambient Temp.+5ºC~+35ºC
PowerAC 380±10% 50Hz ,3 phase 4 wires +Ground Wires

(3) KTS-D Series

Model

 

KTS-D Series
72D100D150D200D252D300D480D
Inside size(mm)W450500600670700800800
H400450500600600600800
D400450500500600650750
Outside size(mm)W1490154016401720175018501850
H1790184018902000200020002200
D1600170018301850193019802500
Test weight5101215182020
Low Temp Chamber-80ºC~-10ºC, Pre cooling time: ≤ 60 min from +20ºCto-80ºC
Test Chamber-65ºC~+150ºC
High Temp Chamber+60ºC~+200ºC ,Within 20 min, Pre-heating time
Transition time≤15S
Recovery timeHigh-Temp Exposure 30 min to reach & stabilize required hot temp of test sample
Low-Temp Exposure 30 min to reach & stabilize required cold temp of test sample
≤ 5 min
Ambient Temp.+5ºC~+35ºC
PowerAC 380±10% 50Hz ,3 phase 4 wires +Ground Wires

 

 

Photos show 

 

 

 

We have professional packing workers to pack your products!

 

 

1. Out packing:Standard export wooden case; Inner packing:With careful stretch film+ hard cardboar;

 

2. Usually we send products by air, but we can also send as your requirements.

Hot Products

Lab Environmental Climatic System Temperature Controlled Test Chamber Ⅰ. Product Overview Able to ...
Environmental Chamber MicroClimate Test Chamber / Programmable Temp Humidity Chamber OEM &ODM are ...
Testing Chamber Temperature and Vibration Combined Climatic Test Chamber Product Description KOMEG ...
Electronic Temperature Humidity Vibration Combined Climatic Test Chamber Vibration Shaker Chamber ...
Moisture Testing Laboratory Room Climatic Temperature And Humidity Chambers Applications Moisture ...
64L Benchtop Climatic Test Chamber With In-hole operation For Calibration Sensor OEM and ODM are ...