Chengdu Laida Mechanical &.Electronic Co.,Ltd |
|
1.Scaffolding plank is the main parts of scaffolding system which is convenient for workers to walk on high building.
2.Stamping holes are on the scaffolding plank to resist skidding for workers.
3.The galvanized surface makes scaffolding plank more stronger in the rainy days and moist environment.
4. Various size of scaffolding plank could be customed.
Product name | Metal scaffolding plank with hooks | ||||
Outer diameter: | 40mm,42mm,48mm,48.3mm | ||||
Wall thickness: | 1.0mm-4.5mm | ||||
Zinc coating: | 280-320g/square meter or as your requirement | ||||
Length | 0.5meter to 16meter | ||||
Material: | Q195,Q235,Q345,A53,A36,SS400,SS330,ST37-2,08YU, | ||||
Technical: | welded:longitudinal welded, | ||||
Application | Construction structure,furniture,shipbuilding,petroleum, | ||||
Power,gas metallurgy | |||||
Package | Hex bundle by steel strip | ||||
In bulk | |||||
anti-water plastic woven | |||||
As your requirement |
Zoe Chen (Foreign Trade Manager)
—————————————————
Tel: +86 028 62016750
Whatapp / wechat: +86 18010686882