Home Companies Daoyunai Energy Saving Technology Limited

Underground UV Cured CIPP Equipment Cured Lining Fiberglass Saturated Resin Installation

Daoyunai Energy Saving Technology Limited

Contact Us

[China] country

Trade Verify

Address: Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city

Contact name:Aaron Wang

Inquir Now

Daoyunai Energy Saving Technology Limited

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Underground UV Cured CIPP Equipment Cured Lining Fiberglass Saturated Resin Installation

Country/Region china
City & Province shanghai shanghai
Categories Chemical Reagents
InquireNow

Product Details

Fiberglass saturated resin installation for underground pipelines by no excavation

 

UV CIPP trenchless construction for sewer repair

 

At the same time as pulling the liner, the operator at the bottom of the inspection well shall be in place to assist the hose at all times to ensure that it is always at the bottom of the pipe without touching the top of the pipe.

If the material diameter is greater than or equal to DN600, it is recommended to apply grease or detergent water at the bottom of the material or above the bottom film to reduce friction.

At the same time, pay attention to the flatness of the material at all times to ensure that it is not knotted or bent. Otherwise, once the material enters the pipeline, it will be difficult to fully expand in case of winding, resulting in waste and economic losses.

At the end of the manhole section, the person responsible for dragging the bottom film and hose should use a hoist, which requires 3-5 tons.

Always pay attention to the safety of operators at the bottom of the manhole.

For the pipes below DN600, the lamp chain shall be used for curing, and the installation of the stainless steel tie at one end and the assembly of the lamp chain shall be completed on the ground.

For pipelines above DN600, the lamp holder shall be used for curing. If the manhole or wellhead is too small, the installation of stainless steel binding head and the assembly of the lamp holder shall be completed inside the pipeline.

When the hose is still 5 meters long, stop dragging and start to install stainless steel ties.

 

 Function Trenchless repair
 Application Cured-in-place-pipe
 Length Any length is possible

 

Hot Products

D919 UV curing equipment pipeline inspection and repair equipment custom lamp bracket leg Requiremen...
Quiet and high-efficiency generator for municipal contractors CIPP D45 generator is especially for ...
Useful tools package for CIPP-UV cure construction on job-site The useful tools package is specially ...
Advanced customized headlamp wheel rack of UV curing equipment manufacturer Operation process of UV ...
CIPP mercury lamp UV cure system for underground drainage trenchless renovation D919 High Voltage ...
Integrated UV-CIPP renovation truck for municipal drainage network D919 UV light cure integrated ...