Daoyunai Energy Saving Technology Limited

Contact Us

[China] country

Trade Verify

Address: Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city

Contact name:Aaron Wang

Inquir Now

Daoyunai Energy Saving Technology Limited

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Light UV CIPP Lining Manufacturers Municipal Pipes Trenchless Sewer Line Repair

Country/Region china
City & Province shanghai shanghai
Categories Water Treatment
InquireNow

Product Details

 

UV CIPP lining of different sizes used for municipal pipes trenchless repair

 

A key step in UV curing construction: inflation and pressure. Before inflation, check whether the pressure detection equipment is normal. If there is any problem, deal with it in time before use.

The whole operation must be carried out in strict accordance with the requirements: the small diameter material has a small stress area and the pressure is too large, while the large diameter material has a large stress area and the pressure is too small. In the process of material inflation, the operator shall observe the pressure at any time and slowly control the pressure rise. After reaching the target pressure, it is necessary to maintain the pressure for a period of time (generally half an hour).

In particular, the operator shall observe whether the stainless steel binding head is loose and whether the material is close to the inner wall of the pipe. If it is not close to the inner wall, the pressure maintaining time can be appropriately extended or the inflation pressure can be appropriately increased.

After pressing and inflating, do not immediately pull the lamp holder to the other end of the material. Turn on the headlight leg after the material pressure of the large pipe diameter rises to the target pressure.

During the pressure maintaining process, the internal conditions of the material must be carefully observed through the internal camera. Whether the inner membrane of the lower lamp material end is damaged and whether there is air intake. You can tell at this time.

When installing the stainless steel binding head, the gas entering the material will soon be discharged through the observation port. If the inner membrane of the material is damaged, the gas inside the material will not decrease slowly, but will increase with the pressing time. If the inner membrane of materials above DN600 is damaged, the tie head can be opened at this time to find the damaged place, and the error can be saved by using adhesive tape to repair it.

 

 Duration: 5 hours
Operating staff: 6 persons
Team: One team
Application: CIPP process

 


 

Hot Products

Large light dual-core for UV cure trenchless system using mercury technology Mercury technology for ...
Highly integrated UV cure equipment used to repair underground sewer by CIPP process DAO company ...
The UV CIPP cure system light rack pulling the rope of high-temperature resistance The reserved rope ...
Small light train for CIPP UV cure system by traditional high voltage mercury Mercury light to cure ...
Blowing hose for UV CIPP cure equipment used for trenchless repair sewers Turn on the blower and ...
Dual blowers for expanding liner during trenchless renovation DAO blower unit uses two sets as one ...