Bythai Scaffolding Co.,Ltd |
Verified Suppliers
|
|
Base Jack Scaffolding is a product made of high-quality steel for building construction. It is designed with an adjustable nut which allows for easy and secure installation. Our Base Jack Scaffolding is highly durable, able to carry load-bearing jacks for heavy loads. It is also suitable for use in different types of areas and can be packed in containers for easy transport. With a minimum order quantity of 1000 pieces, it is the perfect choice for building construction.
Product Name | Base Jack Scaffolding |
---|---|
Color | Silver |
MOQ | 1000 |
Material | Steel |
Surface Treatment | Painted/ Electro-Galvanized/ HDG |
Warranty | 2 Year |
Packing | Container |
Usage | Building Construction |
Base Jack Scaffolding is a perfect solution for any building construction project. It is a reliable, adjustable and cost-effective product. It is made of strong and durable steel and is available in a variety of surface treatments, such as painted, electro-galvanized and HDG. The adjusting nut makes it easy to adjust the height, making it suitable for any construction applications.
The brand name of our Base Jack Scaffolding is Scaffolding Screw Jack and the model number is BM212. We have a minimum order quantity of 1500 and the price ranges from 4.5 to 8.5. The delivery time is 10 to 25 days and the minimum order quantity is 1000. We offer a two-year warranty on all our products.
Brand Name: scaffolding screw jack
Model Number: BM212
Place of Origin: China Tianjin
Minimum Order Quantity: 1500
Price: 4.5-8.5
Delivery Time: 10-25
Product Name: Base Jack Scaffolding
Material: Steel
MOQ: 1000
Surface Treatment: Painted/ Electro-Galvanized/ HDG
Usage: Building Construction
Base Jack Scaffolding is a strong and reliable load-bearing base for scaffolding. It is made of steel and the surface can be treated by painting, electro-galvanizing or hot dip galvanizing. This product is suitable for building construction and it has a MOQ of 1000. The price range is 4.5-8.5 and delivery time is 10-25 days.
Base Jack Scaffolding is packaged and shipped in accordance with the following requirements: