Home Companies Zhangjiagang Jiayuan Machinery Co.,Ltd.

Beer Production Line Beverage Filling Machine Easy Operate With Low Consumption

Zhangjiagang Jiayuan Machinery Co.,Ltd.
Active Member

Contact Us

[China] country

Address: No. 198, Zhenbei Road, Leyu Town, Zhangjiagang City, Jiangsu Province, China

Contact name:Evan Chu

Inquir Now

Zhangjiagang Jiayuan Machinery Co.,Ltd.

Beer Production Line Beverage Filling Machine Easy Operate With Low Consumption

Country/Region china
City & Province jiangsu
Categories Plastic Extruders
InquireNow

Product Details

Stainless Steel beer production line/beverages carbonated drinks with low consumption

 

Introduction

 

It can carry out washing pulp filling, carbonated juice filling and capping in one machine. It is very convenient to change diverse sizes of bottles by means of advanced bottle neck clamping & bottle suspending technology. Advanced programmable PLC is equipped to control the main machine. Working speed can be adjusted by frequency conversion device. Main electronic components are all from famous international enterprises, such as OMRON, Mitsubishi.

 

 

ModelDCGFB40/32/40/12
Number of Rushing Head40
Number of pulp Filling Head32
Number of Carbonated Filling Head40
Cas Screwing Head12
Rated Production Capacity15000BPH
installed capacity9.5KW
Overall Size:(mm)6250*3050*2400

 

Machine Description

 

Bottle washing machine

Bottles are bellowed into bottle shifting wheel by air conveyor, and when the flushing clamp reaches the position of bottle neck, the jaw will hold the bottleneck. Under the guide of leading rail, the bottle will be overturned to 180°into an up-right position, and then transmitted into filling position by secondary bottle shifting wheel.

 

Bottle filling machine

The Filling Part is mainly composed of the filling valve, the switch valve and filling transmission components. The finish-washed bottle is conveyed to filling position by the bottle shifting wheel. At the same time, the valve-opening mechanism will open the filling valves, which with bottle on it, to fill gas in it and then the machine begin to fill liquid. When the liquid level reaches the ration tube, it will stop filling. After closing the valve and finishing exhausting, the neck holding planet of the filling device will clamp the bottle and move down into the capping shifting wheel.

 

Bottle capping machine

The capping part is composed of 3 sets of screw head, capping transmission part, cap unscrambler, under cover tube and sleeving cover part. Filled-finish bottle will be conveyed to the capping position by the bottle shifting wheel. When the bottle passes the sleeving cover device, the bottle mouth can hung on the cap on the cap output part. And the cap from the sleeving cover will be sleeved on the bottle mouth, and then be planished by the tongue depressor. The cap screw head, which the torque has been adjusted on it, descends when it moves on the same straight line with the bottle, and the triplet cap ring gear will be sleeved on the bottle cap and move down.

 

 

Service
 

1.Installation

After equipments reached the workshop of customer, place the equipments according to plane layout we offered. We will arrange seasoned technician for equipments installation, debug and test production at the same time make the equipments reach the rated producing capacity of the line. Time for installation and debug is 15-25 days.

2.Training

Our company offer technology training to customer. The content of training is structure and maintenance of equipments, control and operation of equipments. Training is in the workshop of customer. Seasoned technician will guide and establish training outline. After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures.

3.Quality Guarantee

We promise that our goods are all new and not used. They’re made of suitable material, adopt new design. The quality, specification and function all meet the demand of contract. We promise that the products of this line could storage for one year without adding any aseptic.

 

Hot Products

Stainless Steel one stage Water Purifying Machine 2 - 35 ºC 10000 Liter 370kg Introduction of RO ...
Stainless Jiayuan manufacturer waste water treatment reverse osmosis system 2 - 35 ºC Introduction ...
Control pollution Water Purifying Machine 2 - 35 ºC 10000 Liter Capacity Introduction of RO system ...
Automatic 1 Tons Water Purifying Machine With Hydranautics Filter Membrane Quick Detail: 1. Main ...
Fully Automatic Water Purification Equipment RO 2.75kw for PET Bottle Quick Detail: Capacity range: ...
2 Tons Water Purifying Machine , RO Water Treatment System Quick Detail: Capacity range: 2 tons per ...