Home Companies Suzhou orl power engineering co ., ltd

Garbage Incineration Instrument Boiler Mud Drum TUV Certification

Suzhou orl power engineering co ., ltd
Active Member

Contact Us

[China] country

Contact name:Allen Liu

Inquir Now

Suzhou orl power engineering co ., ltd

Garbage Incineration Instrument Boiler Mud Drum TUV Certification

Country/Region china
InquireNow

Product Details

Garbage Incineration Instrument Boiler Mud Drum TUV Certification

 

Product Description
Boiler Drum
In the water tube boiler the upper drum (Boiler steam drum) provides for separation of steam from water. It also provides liquid holdup capacity (typically 10 to 60 seconds) to allow for a dynamic response to load changes without losing liquid in the downcomer and riser tubes.
The size of the steam drum is determined by the volume required for a clean separation between steam and water to produce a dry saturated steam, it also provides an adequate amount of steam storage. The steam drum is also called the upper drum.
Product Paramenters
Product Name
Boiler Steam Drum ( Steam Water Separator )
Applied Area
Natural Circulation Boiler
Drum Shell Plate Material
- Carbon Steel : Q245R, P265GH, SA516-Gr.60/65/70
- Alloy Steel : Q345R, Q375R, 15CrMoR, 12Cr1MoVR, P355GH , DIWA353
Drum Head Material
Same as shell
Nozzle Tube Material
As per design
Standard
China GB, ASME, EN
Manufacturer Grade
China A Grade, ABS Certificated, TUV Certificated
Working Temperature
Saturation Temperature at rated pressure
Working Pressure
1.6 MPa ~ 22.5 MPa
Shell Plate Thickness
(Drum Wall Thickness)
≤150 mm
Drum Diameter
≤3,200 mm
Drum Length
≤25,000 mm
Welding
-Shell : SMAW, SAW
- Nozzle tube : GTAW (TIG), SMAW
Welding NDT
- Shell longitudinal seam : 100% RT, 100% UT
- Shell circumferential seam : 100% RT, 15% UT
- Nozzle tube angle seam : 100% UT, 100% MT
Related Products

 

Boiler Header
 

 

Boiler Econimizer
 

 

Boiler Waterwall Panel
 

 

Boiler Drum
 

 

Boiler Air Preheater
 

 

Boiler Superheater
 
Why Choose Us
SUZHOU ORL POWER ENGINEERING CO.,LTD
ORL is a leading compamy of manufacturing industrial boilers, power plant boilers and boiler parts(including steam drum,waterwall panel,heater,economizer,evaporator,superheater,H-finned economizer,spirial fin tube,air preheater,fleu etc.)We supply clients with seamless steel tubes/pipes(ASME,EN or BS).

Service

ORL provides our customer with full range of services including boiler design,fabrication,installation and
commissioning,boiler maintenance,and supervision at site.Our pruduct and service include design and manufacture
industrial boilers,pressure vessels and tanks,and pressure parts for power plant boilers(600MW or 1000 MW).
 

Certificates

Verification Certificates of equipments:ISO 9001:2015; ISO4001:2015; ISO45001:2018; CE certificate; CNAS; IAF, etc.
Logistics
For 90% of shipment,we will go by sea,to all main continents such as Middle East,Africa,Oceania and Europe etc.Either by container
or RORO/Bulk shipment.For neighborhood countries of China ,such as Mongolia,Kazzkhstan,Uzbekistan etc.we can ship by road or railway.
Customers
We are a professional manufacturer of industrial boilers inChina.With the scientific progressive conception of rapid
introduction,we make our machinery cover all over the overseas market.We have been producing our goods with mature techniques and first-class quality.
Our pruducts have been wildly used in power plants and large international companies overseas.Such as USA,Brazil,Porto Rico,Guatemala,Spain,Demark,Norway,Turkey,India,Korea,Australia,Middle East,Southeast Asia etc.
FAQ
Q1:How long is the warranty period?
We provide 18 months warranty for all spare parts(exclude fragile parts).

Q2:How do you control the quality?
1) All ORL machines are in strict accordance with the ISO quality and CE system requirements.
2) Each procedure is crafted by professional Skilled labour, followed by particular QC
3) All information of our products can be checked in efficient management system.

Q3:What certifications do you have?
All our products are CE and ISO9001 certified. Numerous design and innovation patent for all our current models and spare parts.

Q4:What kind of service do you provide?
Before sales:
Provide productinformations, market research forecasting, product customization,product processing,consultation and other services for your convenience.

After sales:
1. Technical training on according to customer requirements;
2. We promise replacement under warranty;
3. We promise to supply the maintenance spare parts;
4. Regular call back or visit customers;
5. On time response to mail and phone calls of your complaints or consultation.

Q5:Are you a factory or trading company, where are you located?
We are a factory, just 130km(2 hours by car) away from Shanghai Airport.We offer pickup service at Shanghai for your visit.

 

 

Contact Information

  • ADD: No.11, East Renmin Road, Zhangjiagang City, Jiangsu, China
  • Phone:+86 0512-56770166
  • E-mail: info@orlpower.com
  • Website: www.boiler-units.com 

 

Hot Products

Gas Boiler Spare Parts Steam Boiler Drum Non Toxic High Heating Efficiency Description In the water ...
Carbon Steel Boiler Steam Drum 100 Ton Per Month for Power Station Boiler drum for separating steam ...
Garbage Incineration Instrument Boiler Mud Drum TUV Certification Product Description Boiler Drum In ...
Low Pressure Boiler Mud Drum CFB Boiler Spare Part ASTM Certification Product Description Boiler ...
High Temperature Steam Drum In Boiler , Blowdown Drum Low Pressure Description In the water tube ...
High Strength Thermoplastic Mud Drum In Boiler Anti Corrosion Custom Description In the water tube ...