Home Companies Zhangjiagang HuaDong Boiler Co., Ltd.

220T/H CFB Water Cooling Boiler Membrane Wall For Power Station

Zhangjiagang HuaDong Boiler Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China

Contact name:Sandy Chen

Inquir Now

Zhangjiagang HuaDong Boiler Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

220T/H CFB Water Cooling Boiler Membrane Wall For Power Station

Country/Region china
City & Province jiangsu
Categories Boiler Parts
InquireNow

Product Details

ASME or Ce Standard Membrane Water Wall of 220 T/H CFB Boiler Water Cooling System

 

Introduction

 

HDB provides replacement wall panels, burner openings, inspection ports and doors for utility and industrial boilers. Our membrane water wall are manufactured using high grade raw material and contemporary production equipment at our advanced manufacturing unit. The offered range is available in various sizes, shapes and specifications, as per the requirements of our esteemed clients. Further, these are delivered to the clients within promised time frame.

 

Boiler water walls are membrane walls that are made of tubes welded together with or without a strip of metal in between. These walls form the enclosure of the coal combustion chamber. Water wall tubes are also referred to as the evaporator section; they contain water mostly in liquid form which gradually evaporates as it rises in the boiler.

 

Advantages of Membrane Water Wall


1). To guarantee the leakproofness of furnace wall and reduce the air leak of combustion chamber.

2). To achieve the full water cooling of combustion chamber, and the boiler accessories membrane water wall is benefit to prevent coking under the condition of supplemental firing.

3). The thermal storage capacity is small, the warming of combustion chamber is fast and the cooling is also fast, which could shorten the cooling time of boiler’s start and furnace shut down.

4). It is good to adopt top supported water cooled wall and it could reduce the load of boiler framework, which is benefit to overhang.

 

 

Additional

 

1Water wall panels are used in Waste Heat recovery boilers.
2We manufacture Water wall panels,these are fabricated out of carbon steel tubes to customers' drawings and specifications.
3Special care is taken for ovality and thinning at the bent portion,during fabrication.
4We are manufacturing and supplying a comprehensive range of Waterwall Panels.
5The tubes offered by us are known to withstand a great internal pressure as a continual strip of fin material is wound spirally on the tube.
6These tubes are known to provide heat uniformly that result in an increased heat output.
7The main function of water wall panels in boiler is to absorb the heat generated by high temperature flame or flue and to generate steam or hot water in tubes, hence to reduce the temperature in the chamber.
 

 

Application

 

1Energy saving enviromental protection china supplier membrane water wall for CFB boiler are membrane walls that are made of tubes welded together with or without a strip of metal in between.
2These walls form the enclosure of the coal combustion chamber.
3Water wall tubes are also referred to as the evaporator section; they contain water mostly in liquid form which gradually evaporates as it rises in the boiler.

 

Note

 

1Control of weld penetration to satisfy mechanical and heat transfer requirements Control of the deformation to acceptable tolerances.
2Panels routinely require straightening in the workshop after welding and heat treatment, the question to be answered is can the shop then meet the required dimensional tolerances for successful site installation?
3Can existing shop handling procedures be used as-is without adding excessive controls that will add cost and schedule.
4The importance of preheating and its maintenance through the welding process could cause a number of handling and shop processing issues that will substantially increase cost.
 

 

Membrane/Water Wall Material and Arrangement:
The furnace and roof are made up of membrane water wall and hung on the steel structure by upper hanging suspender of water cooling upper header. Furnace intersecting surface is 3170×5290mm2 and the elevation of top furnace is 28877mm. The membrane water wall is made up of φ60×5 and 6×45 welding steel flat. The combustion chamber is made of φ60×4 steel tube and welded with pin to fasten refractory material. The upper part of combustion chamber connects with furnace membrane water wall. The lower part connects with water cooling wind chamber and water cooling air distributor. The water cooling wind chamber is made up of φ60 steel tube and welded with pins to fasten the refractory material. The water cooling distributor is welded with φ60 steel tube and 6X45 steel flat. The small holes on the steel flat connects with the funnel cap.
The furnace divides left, right, front and back water circulation circuit. The steam leading tube is made up of φ133×5 and φ108×4.5 steel tube. The downcomer is made up of φ108×4.5 steel tube. Install the blowdown valve under the lower header to periodic blow down.

 

 

 

 

Hot Products

ASME Certification Industrial Steam Boiler Parts Economizers Heat Recovery Product Description ...
Description A device installed in the lower part of the boiler tail flue for recycling the waste ...
SA179 Serpentine Tube Economizer For Industrial Boiler ASME Standard Description In boiler...
Carbon Steel Boiler Economizer Fin Tube Economizer With Header For Boilers of Natural Circulation ...
Sugar Cane Mill Factory Bagasse Boiler Economizer Serpentine Coil Anti Corrosion Application of ...
Carbon Steel Made Boiler Economizer Coil in ASME Standard for Sugar Mill Boiler Maintenance Product ...