Home Companies Zhangjiagang HuaDong Boiler Co., Ltd.

Power Station Boiler Manifold Headers , Stainless Steel Boiler Parts

Zhangjiagang HuaDong Boiler Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China

Contact name:Sandy Chen

Inquir Now

Zhangjiagang HuaDong Boiler Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Power Station Boiler Manifold Headers , Stainless Steel Boiler Parts

Country/Region china
City & Province jiangsu
Categories Boiler Parts
InquireNow

Product Details

 
Product Description
In manufacturing, the key of end cover hinder is welding. Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends. In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production.
 
When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers. Such welding methods have high manufacturing efficiency, good quality, beautiful welding shape, safety, reliability, etc.
 
1Headers form an important part of all types of boilers.
2Steam from the generating tubes is collected in headers which are therefore always under pressure.
3This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them.
4Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header.

 

 

Details

 

1.The necking hinders of the Company are made by hot press and retracting of seamless steel pipes at special hinder necking machine.

 

2.In this way, the hinders will have thicker walls and cleaner surface. The necking cover will form membrane stress rather than bending stress with desired stress performance under the effect of inner pressure.

 

Features

 

1. Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod.
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler.
4. Hydraulic test report: ensure the standard working pressure and safety.

5.Excellent in welding quality, highly automatic, safe and reliable.

 

 

Classification

 
MaterialCarbon steel,Alloy steel,Stainless steel.
LengthAccording to costumes requirements.
Temperature Range300℃~1500℃
Diameter(OD)76mm~914mm

 

Materials

1. Carbon steel:20G,SA-106B,SA-106C,etc.

2. Low-alloy thermal resistant steel:15CrMoG,12Cr1MoVG,SA-335P12,SA335-P22,etc.

3. Middle-alloy thermal resistant steel:SA-335P91,etc.

4. Special material(ultra-supercritical):SA-335P122,SA-335P92,etc.

 

The boiler headers have water wall header,superheater header,economizer header and so on. It acts action of gathering, mixing and redistribution in boiler systems. In structure, they include end cover hinders or necking hinders.

 

Certificates

 

 

 

Factory Workshop

 

 

Hot Products

Heat exchanger U bendings Boiler Economiser Heat Economizer Introduction 1 HDB equipment can bend ...
Low temperature revamping modular heat exchange system widely used in boiler industry Introduction 1 ...
Spiral type H type fin tubes boiler economizer ASME For circulating fluifized bed boiler Introductio...
Boiler Exhaust Heat Recovery System Low Temperature Economizer For CFB/ HRSG Boiler Description (1) ...
Low temperature revamping modular heat exchange system assembly by fin tube used in boiler ...
Serpentine Tube Economizer For Industrial Steam Coal Boiler ASME Standard Description 1.In boiler...