Jiangsu Faygo Union Machinery Co., Ltd. |
|
50ml 100ml 200ml 350ml small plastic pesticides bottles Blow Moulding Machines HTSII-3L
double station automatic bottle molding machine SRB60-1C is widely used in PVC plastic bottle and container making field, sport joyshaker water bottle making field, detergent liquid soap bottle making field, small toy parts field, also used for other small round or square pvc containers.
Extrusion blow molding machine technical specification:
Model | HTSII-3L | |
Max. Product Volume | (L) | 0.35L |
Dry cycle | (pc/h) | 800*2 |
Screw Diameter | (mm) | 70/80 |
Screw L/D ratio | (L/D) | 25 |
Screw drive power | (KW) | 22/30 |
Screw heating capacity | (KW) | 4.2/8 |
No. of heating zone | (ZONE) | 3/4 |
Max. Output of HDPE | (Kg/hr) | 70/110 |
Oil pump drive power | (KW) | 11 |
Clamping force | (KN) | 80 |
Platen distance | (mm) | 160~320 |
Mold moving stroke | (mm) | 500 |
Max. Size of Mold(W*H) | (mm) | 450*250 |
Max. Die diameter | (mm) | 30/45 |
Die heat capacity | (KW) | 4.3 |
No. of heating zone | (ZONE) | 13 |
Central distance of Quad head | (mm) | 70/100 |
Blowing pressure | (Mpa) | 0.6 |
Air volume | (M3/MIN) | 0.4 |
Cooling water pressure | (Mpa) | 0.2~0.3 |
Water consumption | (L/MIN) | 80 |
Size of machine ( L*W*H) | (m) | 3.2*2.7*2.5 |
Weight of machine | (TON) | 8 |
Extruson blow molding machine suppliers of main parts:
a) Hydraulic Parts
Name | Supplier |
Oil Pump | PARKER or SUNNY, America |
Valve | YUKEN or SUNNY |
Hose, Joint | PARKER SIR |
Sealer | Top DZ Europe |
b) Electrical Parts
Name | Supplier |
Microcomputer Control System | MITSUBISHI PLC, Japan |
Touch Screen | HITECH color screen, Taiwan |
Temperature Controller | MITSUBISHI, Japan |
Conductor | SCHNEIDER |
Air Switch | SCHNEIDER |
Motor | SIMENS BEIDE Asynchronous Motor |
Power Resource | MEAN WELL, Taiwan |
Inverter | MITSUBISHI |
c) Pneumatic Parts
Name | Supplier |
Solenoid Valve | FESTO, Germany |
Cylinder | FESTO, Germany |
Extrusion blow molding machine installation, commissioning and
training:
If the buyer needs seller to send technicians to workshop for
supervising the erection and start-up, seller must support and send
sufficient number of technicians and keep duration of stay in
workshop. Usually it’s about 3~5 days in this duration. The first
day is that when our technician is at the airport to factory of
buyer. And from the first day, the buyer has to pay US$80 per day.
And all accommodation, visa application & air ticket will be
born by the buyer.